33 CFR § 117.895
Wallooskee River
August 2, 2023
§ 117.895 Wallooskee River.
The draw of the Oregon State secondary highway bridge, mile 1.0 near Astoria, shall open on signal if at least 48 hours notice is given.
[CGD 82–025, 49 FR 17452, Apr. 24, 1984; 49 FR 37382, Sept. 24, 1984]