33 CFR § 117.965
Cow Bayou
August 2, 2023
§ 117.965 Cow Bayou.
The draws of the Orange County highway bridge, mile 2.9 at West Orange, and the S87 bridge, mile 4.5 at Bridge City, shall open on signal if at least six hours notice is given.
[CGD 82–025, 49 FR 17452, Apr. 24, 1984, as amended by USCG–2012–0306, 77 FR 37315, June 21, 2012]