40 CFR Figure E-1
Figure E-1 to Subpart E of Part 53—Designation Testing Checklist
June 9, 2020
DESIGNATION TESTING CHECKLIST
__________ __________ __________
Auditee Auditor signature Date
Open Table
Compliance Status: Y = Yes N = No NA = Not applicable/Not available | Verification Comments (Includes documentation of who, what, where, when, why) (Doc. #, Rev. #, Rev. Date) | |||
---|---|---|---|---|
Verification | Verified by Direct Observation of Process or of Documented Evidence: Performance, Design or Application Spec. Corresponding to Sections of 40 CFR Part 53 or 40 CFR Part 50, Appendix L | |||
Y | N | NA | ||
Performance Specification Tests | ||||
Sample flow rate coefficient of variation (§53.53) (L-7.4.3) | ||||
Filter temperature control (sampling) (§53.57) (L-7.4.10) | ||||
Elapsed sample time accuracy (§53.54) (L-7.4.13) | ||||
Filter temperature control (post sampling) (§53.57) (L-7.4.10) | ||||
Application Specification Tests | ||||
Field Precision (§53.58) (L-5.1) | ||||
Meets all Appendix L requirements (part 53, subpart A, §53.2(a)(3)) (part 53, subpart E, §53.51(a),(d)) | ||||
Filter Weighing (L-8) | ||||
Field Sampling Procedure (§53.30, .31, .34) | ||||
Design Specification Tests | ||||
Filter (L-6) | ||||
Range of Operational Conditions (L-7.4.7) | ||||
The Following Requirements Apply Only to Class I Candidate Equivalent Methods | ||||
Aerosol Transport (§53.59) |