(a) The provisions of this part apply to discharges and to the introduction of pollutants into a publicly owned treatment works resulting from production operations in the Iron and Steel Point Source Category.

(b) Central Treatment Facilities.

(1) The following central treatment facilities presently discharging through the specified outfall are temporarily excluded from the provisions of this part, provided, the owner or operator of the facility requests the Agency to consider establishing alternative effluent limitations and provides the Agency with the information set out in paragraph (b)(2) of this section, on or before July 26, 1982.

Open Table
Plant NPDES permit No. Central treatment facility
1. Armco Steel, Ashland, KY KY 0000485 Total Plant.
2. Bethlehem Steel, Sparrows Point, MD MD 0001201 Humphrey's Creek Outfall 014.
3. Bethlehem Steel, Burns Harbor, IN IN 0000175 Total Plant.
4. Ford Motor Co., Dearborn, MI MI 0003361 Schaefer Road Treatment Plant.
5. Interlake, Inc.,1 Riverdale, IL IL 0002119 Discharge to POTW.
6. J&L Steel, Aliquippa, PA PA 0006131 Chemical Rinse Treatment Plant Outfall 018.
7. J&L Steel, Cleveland, OH OH 0000850 Hot Forming and Finishing Treatment Plant.
8. J&L Steel, Hennepin, IL IL 0002631 Total Plant.
9. J&L Steel, Louisville, OH OH 0007188 Total Plant.
10. J&L Steel, East Chicago, IN IN 0000205 Terminal Treatment Plant.
11. Laclede Steel, Alton, IL IL 0000612 Total Plant.
12. National Steel, Granite City, IL IL 0000329 Total Plant.
13. National Steel, Portage, IN IN 0000337 Total Plant.
14. National Steel, Weirton, WV WV 0003336 Outfall B.
15. Republic Steel, Gadsden, AL AL 0003522 Total Plant.
16. Republic Steel,1 Chicago, IL 0002593 IL. 0002593 Discharge to POTW.
17. U.S. Steel, Lorain, OH OH 0001562 Pipe Mill Lagoon.
18. U.S. Steel, Provo, UT UT 0000361 Total Plant.
19. U.S. Steel, Fairless Hills, PA PA 0013463 Terminal Treatment Plant.
20. U.S. Steel, Gary, IN IN 0000281 Terminal Lagoons.
21. U.S. Steel,1 Chicago, IL IL 0002691 Discharge to POTW.

1The request for alternative effluent limitations for these plants are for indirect discharges to POTWs

(2) The information to be submitted with the request for consideration of alternative effluent limitations is to include:

(i) A schematic diagram of the existing wastewater treatment facility showing each source of wastewater, cooling water, and other waters entering the treatment facility; discharge and recycle flow rates for each water source and each major treatment component;

(ii) Existing monitoring data relating to discharges to and from the central treatment facility including pollutant concentrations, flows and mass loadings; As a minimum, monitoring data should be provided for a six month period of normal operation of the production and treatment facilities. The complete data as well as a data summary including the maximum, minimum, and mean gross discharge loadings and the standard deviation of the discharge loadings for each monitored pollutant should be provided. Any supplemental monitoring data for toxic pollutants should also be provided.

(iii) A scale map of the area of the plant served by the wastewater treatment facility, including the treatment facility and water supply and discharge points;

(iv) An estimate of the least costly investment required to meet the generally applicable limitations or standards for the facility and a description of such treatment system including schematic diagrams showing the major treatment system components and flow rates through the system. As a minimum, the cost estimates should be comprised of a single page summary for each water pollution control system showing estimated installed direct cost totals for mechanical equipment; piping and instrumentation; foundations and structural components; and, electrical components. Indirect costs for contingencies, overhead and profit, engineering fees, and any other indirect costs must be itemized separately. The sum of the direct and indirect costs which represents the owner's or operator's total estimate, must be shown.

(v) The effluent limitations or standards which could be achieved if the discharger were to spend an amount equal to the Agency's model treatment system cost estimate for the facility and the treatment facilities which would be used to meet those limitations or standards. Schematic diagrams and cost estimates as outlined in paragraph (b)(2)(iv) of this section, should be provided for each treatment system; and,

(vi) Production rates in tons per day for each process contributing wastewater to the central treatment facility consistent with those reported by the owner or operator in the NPDES permit application for the central treatment facility.

(3) The request described in subsection (b)(1) of this section, must be based upon the owner's or operator's belief that the cost of bringing the specified central treatment facilities into compliance with the provisions of this part would require expenditures so high compared to the Agency's model treatment system cost estimate applicable to that facility that the applicable limitations or standards would not represent BPT, BAT, BCT, or PSES, as the case may be, for the facility.

[47 FR 23284, May 27, 1982, as amended at 47 FR 41739, Sept. 22, 1982]


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.