This section applies to smelters which are required to submit a SIP Compliance Schedule as discussed below.
(a) Each SIP Compliance Schedule required by §57.201(d) (2) and (3) must contain the following elements:
(1) Description of the overall design of the SO2 control system(s) to be installed;
(2) Descriptions of specific process hardware to be used in achieving compliance with the SIP emission limitation including gas capacity values;
(3) The date by which contracts will be let or purchase orders issued to accomplish any necessary performance improvements;
(4) The date for initiating on-site construction or installation of necessary equipment;
(5) The date by which on-site construction or installation of equipment is to be completed;
(6) The date for achievement of final compliance with SIP emission limitations; and
(7) Any other measures necessary to assure compliance with all SIP requirements as expeditiously as practicable.
(b) Operations of SCS. Smelters to which §57.705 is applicable must comply with all elements of §57.703.