As stated in §63.2386(a), (b), and (f), you must submit compliance reports and startup, shutdown, and malfunction reports according to the following table:

Open Table
You must submit a(n) .  .  . The report must contain .  .  . You must submit the report .  .  .
1. Compliance report or Periodic Report a. The information specified in §63.2386(c), (d), (e). If you had a SSM during the reporting period and you took actions consistent with your SSM plan, the report must also include the information in §63.10(d)(5)(i); AND Semiannually, and it must be postmarked by January 31 or July 31, in accordance with §63.2386(b).
    b. The information required by 40 CFR part 63, subpart TT, UU, or H, as applicable, for pumps, valves, and sampling connections; AND See the submission requirement in item 1.a of this table.
    c. The information required by §63.999(c); AND See the submission requirement in item 1.a of this table.
    d. The information specified in §63.1066(b) including: Notification of inspection, inspection results, requests for alternate devices, and requests for extensions, as applicable. See the submission requirement in item 1.a. of this table.
2. Immediate SSM report if you had a SSM that resulted in an applicable emission standard in the relevant standard being exceeded, and you took an action that was not consistent with your SSM plan a. The information required in §63.10(d)(5)(ii) i. By letter within 7 working days after the end of the event unless you have made alternative arrangements with the permitting authority (§63.10(d)(5)(ii)).

[71 FR 42923, July 28, 2006]