40 CFR Table 12
Applicability of General Provisions to Subpart FFFF
June 9, 2020
As specified in §63.2540, the parts of the General Provisions that apply to you are shown in the following table:
Open Table
Citation | Subject | Explanation |
---|---|---|
§63.1 | Applicability | Yes. |
§63.2 | Definitions | Yes. |
§63.3 | Units and Abbreviations | Yes. |
§63.4 | Prohibited Activities | Yes. |
§63.5 | Construction/Reconstruction | Yes. |
§63.6(a) | Applicability | Yes. |
§63.6(b)(1)-(4) | Compliance Dates for New and Reconstructed sources | Yes. |
§63.6(b)(5) | Notification | Yes. |
§63.6(b)(6) | [Reserved] | |
§63.6(b)(7) | Compliance Dates for New and Reconstructed Area Sources That Become Major | Yes. |
§63.6(c)(1)-(2) | Compliance Dates for Existing Sources | Yes. |
§63.6(c)(3)-(4) | [Reserved] | |
§63.6(c)(5) | Compliance Dates for Existing Area Sources That Become Major | Yes |
§63.6(d) | [Reserved] | |
§63.6(e)(1)-(2) | Operation & Maintenance | Yes. |
§63.6(e)(3)(i), (ii), and (v) through (viii) | Startup, Shutdown, Malfunction Plan (SSMP) | Yes, except information regarding Group 2 emission points and equipment leaks is not required in the SSMP, as specified in §63.2525(j). |
§63.6(e)(3)(iii) and (iv) | Recordkeeping and Reporting During SSM | No, §63.998(d)(3) and 63.998(c)(1)(ii)(D) through (G) specify the recordkeeping requirement for SSM events, and §63.2520(e)(4) specifies reporting requirements. |
§63.6(e)(3)(ix) | SSMP incorporation into title V permit | Yes. |
§63.6(f)(1) | Compliance Except During SSM | Yes. |
§63.6(f)(2)-(3) | Methods for Determining Compliance | Yes. |
§63.6(g)(1)-(3) | Alternative Standard | Yes. |
§63.6(h) | Opacity/Visible Emission (VE) Standards | Only for flares for which Method 22 observations are required as part of a flare compliance assessment. |
§63.6(i)(1)-(14) | Compliance Extension | Yes. |
§63.6(j) | Presidential Compliance Exemption | Yes. |
§63.7(a)(1)-(2) | Performance Test Dates | Yes, except substitute 150 days for 180 days. |
§63.7(a)(3) | Section 114 Authority | Yes, and this paragraph also applies to flare compliance assessments as specified under §63.997(b)(2). |
§63.7(b)(1) | Notification of Performance Test | Yes. |
§63.7(b)(2) | Notification of Rescheduling | Yes. |
§63.7(c) | Quality Assurance/Test Plan | Yes, except the test plan must be submitted with the notification of the performance test if the control device controls batch process vents. |
§63.7(d) | Testing Facilities | Yes. |
§63.7(e)(1) | Conditions for Conducting Performance Tests | Yes, except that performance tests for batch process vents must be conducted under worst-case conditions as specified in §63.2460. |
§63.7(e)(2) | Conditions for Conducting Performance Tests | Yes. |
§63.7(e)(3) | Test Run Duration | Yes. |
§63.7(f) | Alternative Test Method | Yes. |
§63.7(g) | Performance Test Data Analysis | Yes. |
§63.7(h) | Waiver of Tests | Yes. |
§63.8(a)(1) | Applicability of Monitoring Requirements | Yes. |
§63.8(a)(2) | Performance Specifications | Yes. |
§63.8(a)(3) | [Reserved] | |
§63.8(a)(4) | Monitoring with Flares | Yes. |
§63.8(b)(1) | Monitoring | Yes. |
§63.8(b)(2)-(3) | Multiple Effluents and Multiple Monitoring Systems | Yes. |
§63.8(c)(1) | Monitoring System Operation and Maintenance | Yes. |
§63.8(c)(1)(i) | Routine and Predictable SSM | Yes. |
§63.8(c)(1)(ii) | SSM not in SSMP | Yes. |
§63.8(c)(1)(iii) | Compliance with Operation and Maintenance Requirements | Yes. |
§63.8(c)(2)-(3) | Monitoring System Installation | Yes. |
§63.8(c)(4) | CMS Requirements | Only for CEMS. Requirements for CPMS are specified in referenced subparts G and SS of part 63. Requirements for COMS do not apply because subpart FFFF does not require continuous opacity monitoring systems (COMS). |
§63.8(c)(4)(i) | COMS Measurement and Recording Frequency | No; subpart FFFF does not require COMS. |
§63.8(c)(4)(ii) | CEMS Measurement and Recording Frequency | Yes. |
§63.8(c)(5) | COMS Minimum Procedures | No. Subpart FFFF does not contain opacity or VE limits. |
§63.8(c)(6) | CMS Requirements | Only for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part 63. Requirements for COMS do not apply because subpart FFFF does not require COMS. |
§63.8(c)(7)-(8) | CMS Requirements | Only for CEMS. Requirements for CPMS are specified in referenced subparts G and SS of part 63. Requirements for COMS do not apply because subpart FFFF does not require COMS. |
§63.8(d) | CMS Quality Control | Only for CEMS. |
§63.8(e) | CMS Performance Evaluation | Only for CEMS. Section 63.8(e)(5)(ii) does not apply because subpart FFFF does not require COMS. |
§63.8(f)(1)-(5) | Alternative Monitoring Method | Yes, except you may also request approval using the precompliance report. |
§63.8(f)(6) | Alternative to Relative Accuracy Test | Only applicable when using CEMS to demonstrate compliance, including the alternative standard in §63.2505. |
§63.8(g)(1)-(4) | Data Reduction | Only when using CEMS, including for the alternative standard in §63.2505, except that the requirements for COMS do not apply because subpart FFFF has no opacity or VE limits, and §63.8(g)(2) does not apply because data reduction requirements for CEMS are specified in §63.2450(j). |
§63.8(g)(5) | Data Reduction | No. Requirements for CEMS are specified in §63.2450(j). Requirements for CPMS are specified in referenced subparts G and SS of this part 63. |
§63.9(a) | Notification Requirements | Yes. |
§63.9(b)(1)-(5) | Initial Notifications | Yes. |
§63.9(c) | Request for Compliance Extension | Yes. |
§63.9(d) | Notification of Special Compliance Requirements for New Source | Yes. |
§63.9(e) | Notification of Performance Test | Yes. |
§63.9(f) | Notification of VE/Opacity Test | No. Subpart FFFF does not contain opacity or VE limits. |
§63.9(g) | Additional Notifications When Using CMS | Only for CEMS. Section 63.9(g)(2) does not apply because subpart FFFF does not require COMS. |
63.9(h)(1)-(6) | Notification of Compliance Status | Yes, except subpart FFFF has no opacity or VE limits, and 63.9(h)(2)(i)(A) through (G) and (ii) do not apply because 63.2520(d) specifies the required contents and due date of the notification of compliance status report. |
§63.9(i) | Adjustment of Submittal Deadlines | Yes. |
§63.9(j) | Change in Previous Information | No, §63.2520(e) specifies reporting requirements for process changes. |
§63.10(a) | Recordkeeping/Reporting | Yes. |
§63.10(b)(1) | Recordkeeping/Reporting | Yes. |
§63.10(b)(2)(i)-(ii), (iv), (v) | Records related to SSM | No, §§63.998(d)(3) and 63.998(c)(1)(ii)(D) through (G) specify recordkeeping requirements for periods of SSM. |
§63.10(b)(2)(iii) | Records related to maintenance of air pollution control equipment | Yes. |
§63.10(b)(2)(vi), (x), and (xi) | CMS Records | Only for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part 63. |
§63.10(b)(2)(vii)-(ix) | Records | Yes. |
§63.10(b)(2)(xii) | Records | Yes. |
§63.10(b)(2)(xiii) | Records | Only for CEMS. |
§63.10(b)(2)(xiv) | Records | Yes. |
§63.10(b)(3) | Records | Yes. |
§63.10(c)(1)-(6),(9)-(15) | Records | Only for CEMS. Recordkeeping requirements for CPMS are specified in referenced subparts G and SS of this part 63. |
§63.10(c)(7)-(8) | Records | No. Recordkeeping requirements are specified in §63.2525. |
§63.10(d)(1) | General Reporting Requirements | Yes. |
§63.10(d)(2) | Report of Performance Test Results | Yes. |
§63.10(d)(3) | Reporting Opacity or VE Observations | No. Subpart FFFF does not contain opacity or VE limits. |
§63.10(d)(4) | Progress Reports | Yes. |
§63.10(d)(5)(i) | Periodic Startup, Shutdown, and Malfunction Reports | No, §63.2520(e)(4) and (5) specify the SSM reporting requirements. |
§63.10(d)(5)(ii) | Immediate SSM Reports | No. |
§63.10(e)(1) | Additional CEMS Reports | Yes. |
§63.10(e)(2)(i) | Additional CMS Reports | Only for CEMS. |
§63.10(e)(2)(ii) | Additional COMS Reports | No. Subpart FFFF does not require COMS. |
§63.10(e)(3) | Reports | No. Reporting requirements are specified in §63.2520. |
§63.10(e)(3)(i)-(iii) | Reports | No. Reporting requirements are specified in §63.2520. |
§63.10(e)(3)(iv)-(v) | Excess Emissions Reports | No. Reporting requirements are specified in §63.2520. |
§63.10(e)(3)(iv)-(v) | Excess Emissions Reports | No. Reporting requirements are specified in §63.2520. |
§63.10(e)(3)(vi)-(viii) | Excess Emissions Report and Summary Report | No. Reporting requirements are specified in §63.2520. |
§63.10(e)(4) | Reporting COMS data | No. Subpart FFFF does not contain opacity or VE limits. |
§63.10(f) | Waiver for Recordkeeping/Reporting | Yes. |
§63.11 | Control device requirements for flares and work practice requirements for equipment leaks | Yes. |
§63.12 | Delegation | Yes. |
§63.13 | Addresses | Yes. |
§63.14 | Incorporation by Reference | Yes. |
§63.15 | Availability of Information | Yes. |
[68 FR 63888, Nov. 10, 2003, as amended at 70 FR 38561, July 1, 2005; 71 FR 20463, Apr. 20, 2006; 71 FR 40341, July 14, 2006; 73 FR 72816, Dec. 22, 2008]