Open Table
Citation Subject Applies to subpart LLLLLL? Explanation
63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12) (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) Applicability Yes
63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) Reserved No
63.2 Definitions Yes
63.3 Units and Abbreviations Yes
63.4 Prohibited Activities and Circumvention Yes
63.5 Preconstruction Review and Notification Requirements No
63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1), (e)(3)(i), (e)(3)(iii)-(e)(3)(ix), (f) (g), (i), (j) Compliance with Standards and Maintenance Requirements Yes Subpart LLLLLL requires new and existing sources to comply with requirements for startups, shutdowns, and malfunctions in §63.6(e)(3).
63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv) Reserved No
63.6(h)(1)-(h)(4), (h)(5)(i)-(h)(5)(iii), (h)(6)-(h)(9) No Subpart LLLLLL does not include opacity or visible emissions standards or require a continuous opacity monitoring system.
63.7(a), (e), (f), (g), (h) Performance Testing Requirements Yes/No Subpart LLLLLL requires performance tests for new and existing sources; a test for an existing source is not required if a prior test meets the conditions in §63.11395(h).
63.7(b), (c) Yes/No Requirements for notification of performance test and for quality assurance program apply to new sources but not existing sources.
63.8(a)(1), (a)(2), (b), (c)(1)-(c)(3), (f)(1)-(5) Monitoring Requirements Yes
63.8(a)(3) Reserved No
63.8(a)(4) Yes Requirements apply to new sources if flares are the selected control option.
63.8(c)(4)-(c)(8), (d), (e), (f)(6), (g) Yes Requirements apply to new sources but not to existing sources.
63.9(a), (b)(1), (b)(5), (c), (d), (i), (j) Notification Requirements Yes
63.9(e) Yes/No Notification of performance test is required for new area sources.
63.9(b)(2) Yes Initial notification of applicability is required for new and existing area sources.
63.9(b)(3), (h)(4) Reserved No
63.9(b)(4), (h)(5) No
63.9(f), (g) No Subpart LLLLLL does not require a continuous opacity monitoring system or continuous emissions monitoring system.
63.9(h)(1)-(h)(3), (h)(6) Yes Notification of compliance status is required for new and existing area sources.
63.10(a) Recordkeeping Requirements Yes
63.10(b)(1) Yes/No Record retention requirement applies to new area sources but not existing area sources. Subpart LLLLLL establishes 2-year retention period for existing area sources.
63.10(b)(2) Yes Recordkeeping requirements for startups, shutdowns, and malfunctions apply to new and existing area sources.
63.10(b)(3) Yes Recordkeeping requirements for applicability determinations apply to new area sources.
63.10(c)(1), (c)(5)-(c)(14) Yes/No Recordkeeping requirements for continuous parameter monitoring systems apply to new sources but not existing sources.
63.10(c)(2)-(c)(4), (c)(9) Reserved No
63.10(d)(1), (d)(4), (e)(1), (e)(2), (f) Reporting Requirements Yes
63.10(d)(2) Yes Report of performance test results applies to each area source required to conduct a performance test.
63.10(d)(3) No Subpart LLLLLL does not include opacity or visible emissions limits.
63.10(d)(5) Yes Requirements for startup, shutdown, and malfunction reports apply to new and existing area sources.
(e)(1)-(e)(2), (e)(4) No Subpart LLLLLL does not require a continuous emissions monitoring system or continuous opacity monitoring system.
63.10(e)(3) Yes/No Semiannual reporting requirements for excess emissions and parameter monitoring exceedances apply to new area sources but not existing area sources.
63.11 Control Device Requirements Yes Requirements apply to new sources if flares are the selected control option.
63.12 State Authorities and Delegations Yes
63.13 Addresses Yes
63.14 Incorporations by Reference Yes
63.15 Availability of Information and Confidentiality Yes
63.16 Performance Track Provisions. Yes

Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.