Open Table
For *  *  * The owner or operator must meet a PM limit of *  *  * And the owner or operator must meet an opacity limit of *  *  * The owner or operator must demonstrate compliance with these limits by conducting *  *  *
Affected facilities (as defined in §§60.670 and 60.671) that commenced construction, modification, or reconstruction after August 31, 1983 but before April 22, 2008 0.05 g/dscm (0.022 gr/dscf)a 7 percent for dry control devicesb An initial performance test according to §60.8 of this part and §60.675 of this subpart; and
Monitoring of wet scrubber parameters according to §60.674(a) and §60.676(c), (d), and (e).
Affected facilities (as defined in §§60.670 and 60.671) that commence construction, modification, or reconstruction on or after April 22, 2008 0.032 g/dscm (0.014 gr/dscf)a Not applicable (except for individual enclosed storage bins)
7 percent for dry control devices on individual enclosed storage bins
An initial performance test according to §60.8 of this part and §60.675 of this subpart; and
Monitoring of wet scrubber parameters according to §60.674(a) and §60.676(c), (d), and (e); and
    Monitoring of baghouses according to §60.674(c), (d), or (e) and §60.676(b).

aExceptions to the PM limit apply for individual enclosed storage bins and other equipment. See §60.672(d) through (f).

bThe stack opacity limit and associated opacity testing requirements do not apply for affected facilities using wet scrubbers.