You must comply with the applicable General Provisions requirements according to the following table

Open Table
Citation Subject Applicable to
subpart PPPP
Explanation
§63.1(a)(1)-(14) General Applicability Yes.
§63.1(b)(1)-(3) Initial Applicability Determination Yes Applicability to subpart PPPP is also specified in §63.4481.
§63.1(c)(1) Applicability After Standard Established Yes.
§63.1(c)(2)-(3) Applicability of Permit Program for Area Sources No Area sources are not subject to subpart PPPP.
§63.1(c)(4)-(5) Extensions and Notifications Yes.
§63.1(e) Applicability of Permit Program Before Relevant Standard is Set Yes.
§63.2 Definitions Yes Additional definitions are specified in §63.4581.
§63.3(a)-(c) Units and Abbreviations Yes.
§63.4(a)(1)-(5) Prohibited Activities Yes.
§63.4(b)-(c) Circumvention/Severability Yes.
§63.5(a) Construction/Reconstruction Yes.
§63.5(b)(1)-(6) Requirements for Existing, Newly Constructed, and Reconstructed Sources Yes.
§63.5(d) Application for Approval of Construction/Reconstruction Yes.
§63.5(e) Approval of Construction/Reconstruction Yes.
§63.5(f) Approval of Construction/Reconstruction Based on Prior State Review Yes.
§63.6(a) Compliance With Standards and Maintenance Requirements—Applicability Yes.
§63.6(b)(1)-(7) Compliance Dates for New and Reconstructed Sources Yes Section 63.4483 specifies the compliance dates.
§63.6(c)(1)-(5) Compliance Dates for Existing Sources Yes Section 63.4483 specifies the compliance dates.
§63.6(e)(1)-(2) Operation and Maintenance Yes.
§63.6(e)(3) Startup, Shutdown, and Malfunction Plan Yes Only sources using an add-on control device to comply with the standard must complete startup, shutdown, and malfunction plans.
§63.6(f)(1) Compliance Except During Startup, Shutdown, and Malfunction Yes Applies only to sources using an add-on control device to comply with the standard.
§63.6(f)(2)-(3) Methods for Determining Compliance Yes.
§63.6(g)(1)-(3) Use of an Alternative Standard Yes.
§63.6(h) Compliance With Opacity/Visible Emission Standards No Subpart PPPP does not establish opacity standards and does not require continuous opacity monitoring systems (COMS).
§63.6(i)(1)-(16) Extension of Compliance Yes.
§63.6(j) Presidential Compliance Exemption Yes.
§63.7(a)(1) Performance Test Requirements—Applicability Yes Applies to all affected sources. Additional requirements for performance testing are specified in §§63.4564, 63.4565, and 63.4566.
§63.7(a)(2) Performance Test Requirements—Dates Yes Applies only to performance tests for capture system and control device efficiency at sources using these to comply with the standards. Section 63.4560 specifies the schedule for performance test requirements that are earlier than those specified in §63.7(a)(2).
§63.7(a)(3) Performance Tests Required By the Administrator Yes.
§63.7(b)-(e) Performance Test Requirements—Notification, Quality Assurance, Facilities Necessary for Safe Testing, Conditions During Test Yes Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standards.
§63.7(f) Performance Test Requirements—Use Alternative Test Method Yes Applies to all test methods except those of used to determine capture system efficiency.
§63.7(g)-(h) Performance Test Requirements—Data Analysis, Recordkeeping, Reporting, Waiver of Test Yes Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standards.
§63.8(a)(1)-(3) Monitoring Requirements—Applicability Yes Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standards. Additional requirements for monitoring are specified in §63.4568.
§63.8(a)(4) Additional Monitoring Requirements No Subpart PPPP does not have monitoring requirements for flares.
§63.8(b) Conduct of Monitoring Yes.
§63.8(c)(1)-(3) Continuous Monitoring Systems (CMS) Operation and Maintenance Yes Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standard. Additional requirements for CMS operations and maintenance are specified in §63.4568.
§63.8(c)(4) CMS No Section 63.4568 specifies the requirements for the operation of CMS for capture systems and add-on control devices at sources using these to comply.
§63.8(c)(5) COMS No Subpart PPPP does not have opacity or visible emission standards.
§63.8(c)(6) CMS Requirements No Section 63.4568 specifies the requirements for monitoring systems for capture systems and add-on control devices at sources using these to comply.
§63.8(c)(7) CMS Out-of-Control Periods Yes.
§63.8(c)(8) CMS Out-of-Control Periods and Reporting No Section 63.4520 requires reporting of CMS out-of-control periods.
§63.8(d)-(e) Quality Control Program and CMS Performance Evaluation No Subpart PPPP does not require the use of continuous emissions monitoring systems.
§63.8(f)(1)-(5) Use of an Alternative Monitoring Method Yes.
§63.8(f)(6) Alternative to Relative Accuracy Test No Subpart PPPP does not require the use of continuous emissions monitoring systems.
§63.8(g)(1)-(5) Data Reduction No Sections 63.4567 and 63.4568 specify monitoring data reduction.
§63.9(a)-(d) Notification Requirements Yes.
§63.9(e) Notification of Performance Test Yes Applies only to capture system and add-on control device performance tests at sources using these to comply with the standards.
§63.9(f) Notification of Visible Emissions/Opacity Test No Subpart PPPP does not have opacity or visible emission standards.
§63.9(g)(1)-(3) Additional Notifications When Using CMS No Subpart PPPP does not require the use of continuous emissions monitoring systems.
§63.9(h) Notification of Compliance Status Yes Section 63.4510 specifies the dates for submitting the notification of compliance status.
§63.9(i) Adjustment of Submittal Deadlines Yes.
§63.9(j) Change in Previous Information Yes.
§63.10(a) Recordkeeping/Reporting—Applicability and General Information Yes.
§63.10(b)(1) General Recordkeeping Requirements Yes Additional requirements are specified in §§63.4530 and 63.4531.
§63.10(b)(2) (i)-(v) Recordkeeping Relevant to Startup, Shutdown, and Malfunction Periods and CMS Yes Requirements for startup, shutdown, and malfunction records only apply to add-on control devices used to comply with the standards.
§63.10(b)(2) (vi)-(xi) Yes.
§63.10(b)(2) (xii) Records Yes.
§63.10(b)(2) (xiii) No Subpart PPPP does not require the use of continuous emissions monitoring systems.
§63.10(b)(2) (xiv) Yes.
§63.10(b)(3) Recordkeeping Requirements for Applicability Determinations Yes.
§63.10(c)(1)-(6) Additional Recordkeeping Requirements for Sources with CMS Yes
§63.10(c)(7)-(8) No The same records are required in §63.4520(a)(7).
§63.10(c)(9)-(15) Yes.
§63.10(d)(1) General Reporting Requirements Yes Additional requirements are specified in §63.4520.
§63.10(d)(2) Report of Performance Test Results Yes Additional requirements are specified in §63.4520(b).
§63.10(d)(3) Reporting Opacity or Visible Emissions Observations No Subpart PPPP does not require opacity or visible emissions observations.
§63.10(d)(4) Progress Reports for Sources With Compliance Extensions Yes.
§63.10(d)(5) Startup, Shutdown, and Malfunction Reports Yes Applies only to add-on control devices at sources using these to comply with the standards.
§63.10(e)(1)-(2) Additional CMS Reports No Subpart PPPP does not require the use of continuous emissions monitoring systems.
§63.10(e)(3) Excess Emissions/CMS Performance Reports No Section 63.4520(b) specifies the contents of periodic compliance reports.
§63.10(e)(4) COMS Data Reports No Subpart PPPP does not specify requirements for opacity or COMS.
§63.10(f) Recordkeeping/Reporting Waiver Yes.
§63.11 Control Device Requirements/Flares No Subpart PPPP does not specify use of flares for compliance.
§63.12 State Authority and Delegations Yes.
§63.13 Addresses Yes.
§63.14 Incorporation by Reference Yes.
§63.15 Availability of Information/Confidentiality Yes.

Tried the LawStack mobile app?