40 CFR Table 4
Applicability of the General Provisions to Part 63
June 9, 2020
Open Table
Citation | Subject | Applies to subpart HHHHHHH | Comment |
---|---|---|---|
§63.1(a)(1)-(a)(4), (a)(6), (a)(10)-(a)(12), (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) | Applicability | Yes. | |
§63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) | [Reserved] | No. | |
§63.2 | Definitions | Yes | Additional definitions are found in §63.12005. |
§63.3 | Units and abbreviations | Yes. | |
§63.4(a)(1), (a)(2), (b), (c) | Prohibited activities and circumvention | Yes. | |
§63.4(a)(3)-(a)(5) | [Reserved] | No. | |
§63.5(a), (b)(1), (b)(3), (b)(4), (b)(6), (d)-(f) | Preconstruction review and notification requirements | Yes. | |
§63.5(b)(2), (b)(5), (c) | [Reserved] | No. | |
§63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1)(iii), (f)(2), (f)(3), (g), (i), (j) | Compliance with standards and maintenance requirements | Yes | §63.11875 specifies compliance dates. |
§63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(2)(ii), (h)(3), (h)(5)(iv) | [Reserved] | No | |
§63.6(e)(1)(i), (e)(1)(ii), (e)(3), (f)(1) | Startup, shutdown, and malfunction provisions | No. See §63.11890(b) for general duty requirement | |
§63.6(h)(1), (h)(2)(i), (h)(2)(iii), (h)(4), (h)(5)(i)-(h)(5)(iii), (h)(5)(v), (h)(6)-(h)(9) | Compliance with opacity and visible emission standards | No | Subpart HHHHHHH does not specify opacity or visible emission standards. |
§63.7(a)(1), (a)(2), (a)(3), (a)(4), (b)-(d), (e)(2)-(e)(4), (f), (g)(1), (g)(3), (h) | Performance testing requirements | Yes. | |
§63.7(a)(2)(i)-(viii) | [Reserved] | No. | |
§63.7(a)(2)(ix) | Performance testing requirements | Yes. | |
§63.7(e)(1) | Performance testing | No. See especially §63.11945, 63.11960(d), 63.11980(a) | |
§63.7(g)(2) | [Reserved] | No. | |
§63.8(a)(1), (a)(2), (a)(4), (b), (c)(1)(i), (c)(1)(ii), (c)(2)-(c)(4), (c)(6)-(c)(8) | Monitoring requirements | Yes | Except cross reference in §63.8(c)(1)(i) to §63.6(e)(1) is replaced with a cross-reference to §63.11890(b). |
§63.8(a)(3) | [Reserved] | No. | |
§63.8(c)(1)(iii) | Requirement to develop SSM plan for continuous monitoring systems | No. | |
§63.8(c)(5) | Continuous opacity monitoring system minimum procedures | No | Subpart HHHHHHH does not have opacity or visible emission standards. |
§63.8(d) | Written procedures for continuous monitoring systems | Yes, except for last sentence, which refers to an SSM plan. SSM plans are not required | |
§63.8(e) | Continuous monitoring systems performance evaluation | Yes. | |
§63.8(f) | Use of an alternative monitoring method | Yes. | |
§63.8(g) | Reduction of monitoring data | Yes | Except that the minimum data collection requirements are specified in §63.11935(e). |
§63.9(a), (b)(1), (b)(2), (b)(4)(i), (b)(4)(v), (b)(5), (c)-(e), (g)(1), (g)(3), (h)(1)-(h)(3), (h)(5), (h)(6), (i), (j) | Notification requirements | Yes. | |
§63.9(f) | Notification of opacity and visible emission observations | No | Subpart HHHHHHH does not have opacity or visible emission standards. |
§63.9(g)(2) | Use of continuous opacity monitoring system data | No | Subpart HHHHHHH does not require the use of continuous opacity monitoring system. |
§63.9(b)(3), (b)(4)(ii)-(iv), (h)(4) | [Reserved] | No. | |
§63.10(a), (b)(1) | Recordkeeping and reporting requirements | Yes. | |
§63.10(b)(2)(i) | Recordkeeping of occurrence and duration of startups and shutdowns | No. | |
§63.10(b)(2)(ii) | Recordkeeping of malfunctions | No. See §§63.11895(b), 63.11985(b)(4)(i), 63.11985(b)(9) through (11), and 63.11985(c)(7) | |
§63.10(b)(2)(iii) | Maintenance records | Yes. | |
§63.10(b)(2)(iv), (b)(2)(v) | Actions taken to minimize emissions during SSM | No. | |
§63.10(b)(2)(vi) | Recordkeeping for CMS malfunctions | Yes. | |
§63.10(b)(2)(vii)-(x) | Other CMS requirements | Yes. | |
§63.10(b)(2)(xi)-(xiv) | Other recordkeeping requirements | Yes. | |
§63.10(b)(3) | Recordkeeping requirement for applicability determinations | Yes. | |
§63.10(c)(1), (c)(5), (c)(6) | Additional recordkeeping requirements for sources with continuous monitoring systems | Yes. | |
§63.10(c)(2)-(4), (c)(9) | [Reserved] | No. | |
§63.10(c)(7) | Additional recordkeeping requirements for CMS—identifying exceedances and excess emissions during SSM | Yes. | |
§63.10(c)(8) | Additional recordkeeping requirements for CMS—identifying exceedances and excess emissions | Yes. | |
§63.10(c)(10) | Recording nature and cause of malfunctions | No. See §§63.11895(b), 63.11985(b)(4)(i), 63.11985(b)(9) through (11), and 63.11985(c)(7) | |
63.10(c)(11), (c)(12) | Recording corrective actions | No. See §§63.11895(b), 63.11985(b)(4)(i), 63.11985(b)(9) through (11), and 63.11985(c)(7) | |
§63.10(c)(13)-(14) | Records of the total process operating time during the reporting period and procedures that are part of the continuous monitoring system quality control program | Yes. | |
§63.10(c)(15) | Use SSM plan | No. | |
§63.10(d)(1) | General reporting requirements | Yes. | |
§63.10(d)(2) | Performance test results | Yes. | |
§63.10(d)(3) | Opacity or visible emissions observations | No | Subpart HHHHHHH does not specify opacity or visible emission standards. |
§63.10(d)(4) | Progress reports | Yes. | |
§63.10(d)(5) | SSM reports | No. See §§63.11895(b), 63.11985(b)(4)(i), 63.11985(b)(9) through (11), and 63.11985(c)(7) | |
§63.10(e)(1) | Additional continuous monitoring system reports—general | Yes. | |
§63.10(e)(2)(i) | Results of continuous monitoring system performance evaluations | Yes. | |
§63.10(e)(2)(ii) | Results of continuous opacity monitoring system performance evaluations | No | Subpart HHHHHHH does not require the use of continuous opacity monitoring system. |
§63.10(e)(3) | Excess emissions/continuous monitoring system performance reports | Yes. | |
§63.10(e)(4) | Continuous opacity monitoring system data reports | No | Subpart HHHHHHH does not require the use of continuous opacity monitoring system. |
§63.10(f) | Recordkeeping/reporting waiver | Yes. | |
63.11(a) | Control device and work practice requirements—applicability | Yes. | |
§63.11(b) | Flares | No | Facilities subject to subpart HHHHHHH do not use flares as control devices, as specified in §63.11925(b). |
§63.11(c)-(e) | Alternative work practice for monitoring equipment for leaks | Yes. | |
§63.12 | State authority and delegations | Yes | §63.12000 identifies types of approval authority that are not delegated. |
§63.13 | Addresses | Yes. | |
§63.14 | Incorporations by reference | Yes | Subpart HHHHHHH incorporates material by reference. |
§63.15 | Availability of information and confidentiality | Yes. | |
§63.16 | Performance track provisions | Yes. |