40 CFR Table 5 to Subpart OOO of Part 63
Reports Required by This Subpart
June 9, 2020
Open Table
Reference | Description of report | Due date |
---|---|---|
§63.1400(j) and Subpart A of this part | Refer to Table 1 and Subpart A of this part | Refer to Subpart A of this part. |
63.1417(d) | Precompliance Report | Existing affected sources—12 months prior to the compliance date. New affected sources—with application for approval of construction or reconstruction. |
63.1417(e) | Notification of Compliance Status | Within 150 days after the compliance date. |
63.1417(f) | Periodic Reports | Semiannually, no later than 60 days after the end of each 6-month period. See §63.1417(f)(1) for the due date for the first report. |
63.1417(f)(12) | Quarterly reports upon request of the administrator | No later than 60 days after the end of each quarter. |
63.1417(g) | Start-up, shutdown, and malfunction reports | Semiannually (same schedule as Periodic reports). |
63.1417(h)(1) | Notification of storage vessel inspection | As specified in 40 CFR part 63, subpart WW. |
63.1417(h)(2) | Site-specific test plan | 90 days prior to planned date of test. |
63.1417(h)(3) | Notification of planned performance test | 30 days prior to planned date of test. |
63.1417(h)(4) | Notification of change in primary product | As specified in §63.1400 (g)(7) or (g)(8). |
63.1417(h)(5) | Notification of added emission points | 180 days prior to the appropriate compliance date. |
63.1417(h)(6) | Notification that a small control device has been redesignated as a large control device | Within 60 days of the redesignation of control device size. |
63.1417(h)(7) | Notification of process change | Within 60 days after performance test or applicability assessment, whichever is sooner. |
63.1417(h)(8) | Electronic reporting | Within 60 days after completing performance test. |
aNote that the APPU remains subject to this subpart until the notification under §63.1400(g)(7) is made.
[65 FR 3290, Jan. 20, 2000, as amended at 79 FR 60935, Oct. 8, 2014]