Open Table
Report Due date Contents Reference
Waste Management Plan No later than the date specified in table 1 for submittal of the final control plan   Waste management plan §60.2755.
Initial Test Report No later than 60 days following the initial performance test   Complete test report for the initial performance test
  The values for the site-specific operating limits
  Installation of bag leak detection systems for fabric filters
§60.2760.
Annual report No later than 12 months following the submission of the initial test report. Subsequent reports are to be submitted no more than 12 months following the previous report   Name and address
  Statement and signature by responsible official
  Date of report
  Values for the operating limits
  Highest recorded 3-hour average and the lowest 3-hour average, as applicable, (or 30-day average, if applicable) for each operating parameter recorded for the calendar year being reported
  If a performance test was conducted during the reporting period, the results of the test
  If a performance test was not conducted during the reporting period, a statement that the requirements of §60.2720(a) were met
  Documentation of periods when all qualified CISWI operators were unavailable for more than 8 hours but less than 2 weeks
  If you are conducting performance tests once every 3 years consistent with §60.2720(a), the date of the last 2 performance tests, a comparison of the emission level you achieved in the last 2 performance tests to the 75 percent emission limit threshold required in §60.2720(a) and a statement as to whether there have been any operational changes since the last performance test that could increase emissions
  Any malfunction, deviation, or continuous monitoring system out of control periods information as specified in §60.2770(k) through (o)
  Fuel input information for energy recovery unit subcategory verification as specified in §60.2770(p)
§§60.2765 and 60.2770.
Emission limitation or operating limit deviation report By August 1 of that year for data collected during the first half of the calendar year. By February 1 of the following year for data collected during the second half of the calendar year   Dates and times of deviation
  Averaged and recorded data for those dates
  Duration and causes of each deviation and the corrective actions taken
  Copy of operating limit monitoring data and any test reports
  Dates, times and causes for monitor downtime incidents
§60.2775 and 60.2780.
Qualified Operator Deviation Notification Within 10 days of deviation   Statement of cause of deviation
  Description of efforts to have an accessible qualified operator
  The date a qualified operator will be accessible
§60.2785(a)(1).
Qualified Operator Deviation Status Report Every 4 weeks following deviation   Description of efforts to have an accessible qualified operator
  The date a qualified operator will be accessible
  Request for approval to continue operation
§60.2785(a)(2).
Qualified Operator Deviation Notification of Resumed Operation Prior to resuming operation   Notification that you are resuming operation §60.2785(b).

1This table is only a summary, see the referenced sections of the rule for the complete requirements.


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.