40 CFR Table 7
Applicability of General Provisions to Subpart YYYY
June 9, 2020
You must comply with the applicable General Provisions requirements:
Open Table
Citation | Subject | Applies to subpart YYYY | Explanation |
---|---|---|---|
§63.1 | General applicability of the General Provisions | Yes | Additional terms defined in §63.6175. |
§63.2 | Definitions | Yes | Additional terms defined in §63.6175. |
§63.3 | Units and abbreviations | Yes | |
§63.4 | Prohibited activities | Yes | |
§63.5 | Construction and reconstruction | Yes | |
§63.6(a) | Applicability | Yes | |
§63.6(b)(1)-(4) | Compliance dates for new and reconstructed sources | Yes | |
§63.6(b)(5) | Notification | Yes | |
§63.6(b)(6) | [Reserved] | ||
§63.6(b)(7) | Compliance dates for new and reconstructed area sources that become major | Yes | |
§63.6(c)(1)-(2) | Compliance dates for existing sources | Yes | |
§63.6(c)(3)-(4) | [Reserved] | ||
§63.6(c)(5) | Compliance dates for existing area sources that become major | Yes | |
§63.6(d) | [Reserved] | ||
§63.6(e)(1)(i) | General duty to minimize emissions | Yes before September 8, 2020. No after September 8, 2020. See §63.6105 for general duty requirement. |
|
§63.6(e)(1)(ii) | Requirement to correct malfunctions ASAP | Yes before September 8, 2020. No after September 8, 2020. |
|
§63.6(e)(1)(iii) | Operation and Maintenance Requirements | Yes | |
§63.6(e)(2) | [Reserved] | ||
§63.6(e)(3) | SSMP | Yes before September 8, 2020. No after September 8, 2020. |
|
§63.6(f)(1) | Applicability of standards except during startup, shutdown, or malfunction (SSM) | Yes before September 8, 2020. No after September 8, 2020. |
|
§63.6(f)(2) | Methods for determining compliance | Yes | |
§63.6(f)(3) | Finding of compliance | Yes | |
§63.6(g)(1)-(3) | Use of alternative standard | Yes | |
§63.6(h) | Opacity and visible emission standards | No | Subpart YYYY does not contain opacity or visible emission standards. |
§63.6(i) | Compliance extension procedures and criteria | Yes | |
§63.6(j) | Presidential compliance exemption | Yes | |
§63.7(a)(1)-(2) | Performance test dates | Yes | Subpart YYYY contains performance test dates at §63.6110. |
§63.7(a)(3) | Section 114 authority | Yes | |
§63.7(b)(1) | Notification of performance test | Yes | |
§63.7(b)(2) | Notification of rescheduling | Yes | |
§63.7(c) | Quality assurance/test plan | Yes | |
§63.7(d) | Testing facilities | Yes | |
§63.7(e)(1) | Conditions for conducting performance tests | Yes before September 8, 2020. No after September 8, 2020. |
|
§63.7(e)(2) | Conduct of performance tests and reduction of data | Yes | Subpart YYYY specifies test methods at §63.6120. |
§63.7(e)(3) | Test run duration | Yes | |
§63.7(e)(4) | Administrator may require other testing under section 114 of the CAA | Yes | |
§63.7(f) | Alternative test method provisions | Yes | |
§63.7(g) | Performance test data analysis, recordkeeping, and reporting | Yes | |
§63.7(h) | Waiver of tests | Yes | |
§63.8(a)(1) | Applicability of monitoring requirements | Yes | Subpart YYYY contains specific requirements for monitoring at §63.6125. |
§63.8(a)(2) | Performance specifications | Yes | |
§63.8(a)(3) | [Reserved] | ||
§63.8(a)(4) | Monitoring for control devices | No | |
§63.8(b)(1) | Monitoring | Yes | |
§63.8(b)(2)-(3) | Multiple effluents and multiple monitoring systems | Yes | |
§63.8(c)(1) | Monitoring system operation and maintenance | Yes | |
§63.8(c)(1)(i) | General duty to minimize emissions and CMS operation | Yes before September 8, 2020. No after September 8, 2020. |
|
§63.8(c)(1)(ii) | Parts for repair of CMS readily available | Yes | |
§63.8(c)(1)(iii) | Requirement to develop SSM Plan for CMS | Yes before September 8, 2020. No after September 8, 2020. |
|
§63.8(c)(2)-(3) | Monitoring system installation | Yes | |
§63.8(c)(4) | Continuous monitoring system (CMS) requirements | Yes | Except that subpart YYYY does not require continuous opacity monitoring systems (COMS). |
§63.8(c)(5) | COMS minimum procedures | No | |
§63.8(c)(6)-(8) | CMS requirements | Yes | Except that subpart YYYY does not require COMS. |
§63.8(d)(1)-(2) | CMS quality control | Yes | |
§63.8(d)(3) | Written procedures for CMS | Yes before September 8, 2020. No after September 8, 2020. |
|
§63.8(e) | CMS performance evaluation | Yes | Except for §63.8(e)(5)(ii), which applies to COMS. |
§63.8(f)(1)-(5) | Alternative monitoring method | Yes | |
§63.8(f)(6) | Alternative to relative accuracy test | Yes | |
§63.8(g) | Data reduction | Yes | Except that provisions for COMS are not applicable. Averaging periods for demonstrating compliance are specified at §§63.6135 and 63.6140. |
§63.9(a) | Applicability and State delegation of notification requirements | Yes | |
§63.9(b)(1)-(5) | Initial notifications | Yes | Except that §63.9(b)(3) is reserved. |
§63.9(c) | Request for compliance extension | Yes | |
§63.9(d) | Notification of special compliance requirements for new sources | Yes | |
§63.9(e) | Notification of performance test | Yes | |
§63.9(f) | Notification of visible emissions/opacity test | No | Subpart YYYY does not contain opacity or VE standards. |
§63.9(g)(1) | Notification of performance evaluation | Yes | |
§63.9(g)(2) | Notification of use of COMS data | No | Subpart YYYY does not contain opacity or VE standards. |
§63.9(g)(3) | Notification that criterion for alternative to relative accuracy test audit (RATA) is exceeded | Yes | |
§63.9(h) | Notification of compliance status | Yes | Except that notifications for sources not conducting performance tests are due 30 days after completion of performance evaluations. §63.9(h)(4) is reserved. |
§63.9(i) | Adjustment of submittal deadlines | Yes | |
§63.9(j) | Change in previous information | Yes | |
§63.10(a) | Administrative provisions for recordkeeping and reporting | Yes | |
§63.10(b)(1) | Record retention | Yes | |
§63.10(b)(2)(i) | Recordkeeping of occurrence and duration of startups and shutdowns | Yes before September 8, 2020. No after September 8, 2020. |
|
§63.10(b)(2)(ii) | Recordkeeping of failures to meet a standard | Yes before September 8, 2020. No after September 8, 2020. See §63.6155 for recordkeeping of (1) date, time and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure. |
|
§63.10(b)(2)(iii) | Maintenance records | Yes | |
§63.10(b)(2)(iv)-(v) | Records related to actions during SSM | Yes before September 8, 2020. No after September 8, 2020. |
|
§63.10(b)(2)(vi)-(xi) | CMS records | Yes | |
§63.10(b)(2)(xii) | Record when under waiver | Yes | |
§63.10(b)(2)(xiii) | Records when using alternative to RATA | Yes | |
§63.10(b)(2)(xiv) | Records of supporting documentation | Yes | |
§63.10(b)(3) | Records of applicability determination | Yes | |
§63.10(c)(1)-(14) | Additional records for sources using CMS | Yes | Except that §63.10(c)(2)-(4) and (9) are reserved. |
§63.10(c)(15) | Use of SSM Plan | Yes before September 8, 2020. No after September 8, 2020. |
|
§63.10(d)(1) | General reporting requirements | Yes | |
§63.10(d)(2) | Report of performance test results | Yes | |
§63.10(d)(3) | Reporting opacity or VE observations | No | Subpart YYYY does not contain opacity or VE standards. |
§63.10(d)(4) | Progress reports | Yes | |
§63.10(d)(5) | Startup, shutdown, and malfunction reports | No. After September 8, 2020, see 63.6150(a) for malfunction reporting requirements. | |
§63.10(e)(1) and (2)(i) | Additional CMS reports | Yes | |
§63.10(e)(2)(ii) | COMS-related report | No | Subpart YYYY does not require COMS. |
§63.10(e)(3) | Excess emissions and parameter exceedances reports | Yes | After September 8, 2020 submitted with the compliance report through CEDRI according to §63.6150(a). |
§63.10(e)(4) | Reporting COMS data | No | Subpart YYYY does not require COMS. |
§63.10(f) | Waiver for recordkeeping and reporting | Yes | |
§63.11 | Flares | No | |
§63.12 | State authority and delegations | Yes | |
§63.13 | Addresses | Yes | After September 8, 2020 not applicable to reports required to be submitted through CEDRI by 63.6150(c), (e), (f), or (g). |
§63.14 | Incorporation by reference | Yes | |
§63.15 | Availability of information | Yes |
[85 FR 13543, Mar. 9, 2020]