Examples of performance indicators include, but are not limited to, a percentage increase or decrease:
(a) Of operations scheduling effectiveness;
(b) Of repeat system discrepancies over a specific period of time;
(c) In logistical response time for returned parts processing over a specified period of time;
(d) In lost man-hours due to personnel injuries;
(e) In aircraft turn-around time;
(f) In fuel expenditures for a given mission, location, or type/model/series of aircraft;
(g) In aircraft availability or non-availability rates;
(h) In full-mission-capable aircraft over a specific time period;
(i) In non-airworthy maintenance;
(j) In maintenance costs per flying hour; or
(k) In variable cost per passenger mile.