Allowable costs for preparing a mobile home for shipment include but are not limited to:

(a) Blocking and unblocking (including anchoring and unanchoring);

(b) Labor costs of removing and installing skirting;

(c) Separating, preparing, and sealing each section for movement;

(d) Reassembling the two halves of a double-wide mobile home;

(e) Travel lift fees;

(f) Rental, installation, removal and transportation of hitches and extra axles with wheels and tires;

(g) Purchasing blocks in lieu of transporting blocks from old official station and cost of replacement blocks broken while mobile home was being transported;

(h) Packing and unpacking of HHG associated with the mobile home;

(i) Disconnecting and connecting utilities;

(j) Installation and removal of towing lights on trailer;

(k) Charges for reasonable extension of existing water and sewer lines; and

(l) Dismantling and assembling a portable room appended to a mobile home.


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.