If you hold a right-of-way authorizing solar energy site-specific or project-area testing, or solar energy development, you must pay an annual rent and fee in accordance with this section and subpart. Your solar energy right-of-way authorization will either be a grant (if issued under subpart 2804) or a lease (if issued under subpart 2809). Rents and fees for either type of authorization consist of an acreage rent that must be paid prior to issuance of the authorization and a phased-in MW capacity fee. Both the acreage rent and the phased-in MW capacity fee are charged and calculated consistent with §2806.11 and prorated consistent with §2806.12(a). The MW capacity fee will vary depending on the size and technology of the solar energy development project.

[81 FR 92217, Dec. 19, 2016]