(a) A drilling program describes all the operational aspects of your proposal to drill, complete, and test a well.

(b) Send to BLM:

(1) A detailed description of the equipment, materials, and procedures you will use;

(2) The proposed/anticipated depth of the well;

(3) If you plan to directionally drill your well, also send us:

(i) The proposed bottom hole location and distances from the nearest section or tract lines;

(ii) The kick-off point;

(iii) The direction of deviation;

(iv) The angle of build-up and maximum angle; and

(v) Plan and cross section maps indicating the surface and bottom hole locations;

(4) The casing and cementing program;

(5) The circulation media (mud, air, foam, etc.);

(6) A description of the logs that you will run;

(7) A description and diagram of the blowout prevention equipment you will use during each phase of drilling;

(8) The expected depth and thickness of fresh water zones;

(9) Anticipated lost circulation zones;

(10) Anticipated reservoir temperature and pressure;

(11) Anticipated temperature gradient in the area;

(12) A plat certified by a licensed surveyor showing the surveyed surface location and distances from the nearest section or tract lines;

(13) Procedures and durations of well testing; and

(14) Any other information we may require.