Maps of underground workings and surface operations must be to a scale of 1:24,000 or larger if the BLM requests it. All maps must be appropriately marked with reference to government land marks or lines and elevations with reference to sea level. When required by the BLM, include vertical projections and cross sections in plan views. Maps must be based on accurate surveys and certified by a professional engineer, professional land surveyor, or other professionally qualified person. Accurate copies of such maps must be furnished by the operator to the BLM when and as required. All maps submitted must be in a format acceptable to the BLM. Contact the proper BLM office for information on what is the acceptable format to submit maps.
43 CFR § 3931.60
Maps of underground and surface mine workings and in situ surface operations
June 11, 2020