43 CFR § 404.9
What types of infrastructure and facilities may be included in an eligible rural water supply project?
June 11, 2020
CFR

A rural water supply project may include, but is not limited to, the following types of infrastructure and facilities:

(a) Pumps, pipes, wells, surface water intakes and other diversion, transmission, or distribution systems;

(b) Storage tanks and small impoundments;

(c) Water treatment facilities for potable water supplies, including desalination facilities;

(d) Buildings necessary to house equipment and serve as a center for operations;

(e) Power transmission and related facilities required for the rural water supply project;

(f) Equipment and management tools for water conservation, groundwater recovery, and water reuse and recycling;

(g) Associated features to mitigate adverse environmental consequences of a project; and

(h) Appurtenances.


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.