If there is no temporary emergency power source, the loads under §112.15-1 must be arranged so that they can be energized from the final emergency power source.


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.