(a) If there is a reduction of potential of the normal source by 15 to 40 percent, the loads under §112.15-1 must be automatically supplied from the temporary emergency power source.

(b) For systems in which a reduction of frequency of the normal source or final emergency power source adversely affects the emergency system and emergency loads, there must be means to transfer the loads under §112.15-1 to the temporary emergency power source upon a reduction in the frequency of the normal source or final emergency power source.


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.