46 CFR § 115.702
Installation tests and inspections
April 15, 2021
Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial inspection for certification of the vessel, as replacement equipment or as a new installation, the owner or managing operator shall conduct the tests and make the vessel ready for the inspections required by §115.402(d) of this part to the satisfaction of the cognizant OCMI.