46 CFR § 52.20-17
Opening between boiler and safety valve (modifies PFT-44)
April 15, 2021
When a discharge pipe is used, it must be installed in accordance with the requirements of §52.01-105.
[CGD 81-79, 50 FR 9434, Mar. 8, 1985]
When a discharge pipe is used, it must be installed in accordance with the requirements of §52.01-105.
[CGD 81-79, 50 FR 9434, Mar. 8, 1985]