46 CFR Subpart 52.01
General Requirements
April 15, 2021
§
52.01-1
Incorporation by reference
§
52.01-2
Adoption of section I of the ASME Boiler and Pressure Vessel Code
§
52.01-3
Definitions of terms used in this part
§
52.01-5
Plans
§
52.01-10
Automatic controls
§
52.01-35
Auxiliary, donkey, fired thermal fluid heater, and heating boilers
§
52.01-40
Materials and workmanship
§
52.01-50
Fusible plugs (modifies A-19 through A-21)
§
52.01-55
Increase in maximum allowable working pressure
§
52.01-90
Materials (modifies PG-5 through PG-13)
§
52.01-95
Design (modifies PG-16 through PG-31 and PG-100)
§
52.01-100
Openings and compensation (modifies PG-32 through PG-39, PG-42 through PG-55)
§
52.01-105
Piping, valves and fittings (modifies PG-58 and PG-59)
§
52.01-110
Water-level indicators, water columns, gauge-glass connections, gauge cocks, and pressure gauges (modifies PG-60)
§
52.01-115
Feedwater supply (modifies PG-61)
§
52.01-120
Safety valves and safety relief valves (modifies PG-67 through PG-73)
§
52.01-130
Installation
§
52.01-135
Inspection and tests (modifies PG-90 through PG-100)
§
52.01-140
Certification by stamping (modifies PG-104 through PG-113)
§
52.01-145
Manufacturers' data report forms (modifies PG-112 and PG-113)