48 CFR § 1316.603-3
Limitations
November 17, 2020
The designee authorized to determine that a letter contract is suitable so that work can begin immediately is set forth in CAM 1301.70.
The designee authorized to determine that a letter contract is suitable so that work can begin immediately is set forth in CAM 1301.70.