49 CFR Subpart D
Construction
November 18, 2020
§
195.210
Pipeline location
§
195.256
Crossing of railroads and highways
§
195.258
Valves: General
§
195.208
Welding of supports and braces
§
195.200
Scope
§
195.202
Compliance with specifications or standards
§
195.204
Inspection—general
§
195.205
Repair, alteration and reconstruction of aboveground breakout tanks that have been in service
§
195.206
Material inspection
§
195.207
Transportation of pipe
§
195.212
Bending of pipe
§
195.214
Welding procedures
§
195.216
Welding: Miter joints
§
195.222
Welders and welding operators: Qualification of welders and welding operators
§
195.224
Welding: Weather
§
195.226
Welding: Arc burns
§
195.228
Welds and welding inspection: Standards of acceptability
§
195.230
Welds: Repair or removal of defects
§
195.234
Welds: Nondestructive testing
§
§195.236-195.244
[Reserved]
§
195.246
Installation of pipe in a ditch
§
195.248
Cover over buried pipeline
§
195.250
Clearance between pipe and underground structures
§
195.252
Backfilling
§
195.254
Above ground components
§
195.260
Valves: Location
§
195.262
Pumping equipment
§
195.264
Impoundment, protection against entry, normal/emergency venting or pressure/vacuum relief for aboveground breakout tanks
§
195.266
Construction records