49 CFR Topic
Impoundment Design and Capacity
November 18, 2020
§
193.2155
Structural requirements
§
§193.2157-193.2159
[Reserved]
§
193.2161
Dikes, general
§
§193.2163-193.2165
[Reserved]
§
193.2167
Covered systems
§
§193.2169-193.2171
[Reserved]
§
193.2173
Water removal
§
§193.2175-193.2179
[Reserved]
§
193.2181
Impoundment capacity: LNG storage tanks
§
§193.2183-193.2185
[Reserved]