Allowable costs for preparing a mobile home for shipment include but are not limited to:
(a) Blocking and unblocking (including anchoring and unanchoring);
(b) Labor costs of removing and installing skirting;
(c) Separating, preparing, and sealing each section for movement;
(d) Reassembling the two halves of a double-wide mobile home;
(e) Travel lift fees;
(f) Rental, installation, removal and transportation of hitches and extra axles with wheels and tires;
(g) Purchasing blocks in lieu of transporting blocks from old official station and cost of replacement blocks broken while mobile home was being transported;
(h) Packing and unpacking of HHG associated with the mobile home;
(i) Disconnecting and connecting utilities;
(j) Installation and removal of towing lights on trailer;
(k) Charges for reasonable extension of existing water and sewer lines; and
(l) Dismantling and assembling a portable room appended to a mobile home.