(a) For an OSV assigned a loadline, see subchapter E (Load Lines) of this chapter, for special requirements on strength, loadline markings, closure of openings, and the like.

(b) Each OSV of at least 6,000 GT ITC (500 GRT if GT ITC is not assigned) must be assigned an international load line in accordance with the International Convention on Load Lines, 1966, as amended (incorporated by reference, see §125.180).

[CGD 82-004 and CGD 86-074, 62 FR 49321, Sept. 19, 1997, as amended by USCG-2012-0208, 79 FR 48934, Aug. 18, 2014]


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.