Search returned 320226 results for "free fc coins xbox one Visit Buyfc26coins.com for latest FC 26 coins news..yEY9"
63 FR 35529, June 30, 1998.
§ 117.397 Wabash River.
The draws of the bridges across the Wabash River need not be opened for the passage of vessels.
[USCG–2008–0100, 73 FR 76219
necessary to determine whether a violation of these regulations occurred.
(b) If a compliance review or pre-award review indicates a violation of the Act or these regulations, ED attempts to achieve voluntary compliance with the Act. If voluntary compliance cannot be achieved, ED arranges for enforcement as described in § 110.35.
63 FR 35529, June 30, 1998.
§ 117.663 Minnesota River.
The draws of bridges above LeSueur need not be opened for the passage of vessels.
[CGD08–97–004, 63 FR 4584, Jan. 30, 1998
63 FR 35529, June 30, 1998.
§ 117.737 Oldmans Creek.
The draws of the US30 bridge, mile 3.1 at Nortonville, the Conrail railroad bridge, mile 4.0 at Jumbo, and the Salem County bridge, mile 5.1 at Pedricktown, need not be opened for the passage of vessels. However, the draws of any of these bridges shall be restored
63 FR 35529, June 30, 1998.
§ 117.750 Schellenger Creek.
The draw of the Cape May County bridge, mile 0.3 at Cape May, need not be opened for the passage of vessels.
[CGD 82–025,
63 FR 35529, June 30, 1998.
§ 117.699 Little Harbor.
The draw of the SR1B bridge, mile 1.0 between New Castle and Rye, shall open on signal from April 1 through October 31 from 6 a.m. to 10 p.m. if at least four hours notice is given. At all other times, the draw shall open as soon as possible only for emergencies
Quinton, need not be opened for the passage of vessels.
{"origins":[{"level":"part","identifier":"117","label_level":"Part 117","hierarchy":{"title":"33","chapter":"I","subchapter":"J","part":"117"},"current":false,"authority":["\u003ca href=\"https://www.govinfo.gov/link/uscode/33/499\" class=\"usc external\" target=\"_blank\" rel=\"noopener noreferrer\"\u003e33 U.S.C. 499\u003c/a\u003e; \u003ca href=\"/current/title-33
63 FR 35529, June 30, 1998.
§ 117.813 Wappinger Creek.
The draw of the Metro-North Commuter railroad bridge, mile 0.0 at New Hamburg, need not be opened for the passage of vessels. However, the draw shall be returned to operable condition within six months after notification by the District Commander to do so.
63 FR 35529, June 30, 1998.
§ 117.837 Roanoke River.
The draw of the Seaboard System Railroad bridge, mile 94.0 at Palmyra, need not be opened for the passage of vessels.
[CGD5–92–004,
63 FR 35529, June 30, 1998.
§ 117.841 Smith Creek.
The draw of the S117–S133 Bridge, mile 1.5 at Wilmington, need not open for the passage of vessels.
[USCG–2008–0302, 73 FR 46194
§ 3.70–1, excluding those areas within the Honolulu and Guam Marine Inspection Zones, as described in this part.
(b) Only for this part, the boundary between Activities Far East and Activities Europe Marine Inspection Zones is demarked by a southerly line bisecting the border of the Republic of India and the Islamic Republic of Pakistan.
[USCG–2010–0351,
waterfront structure, including, but not limited to, inadequate guard service, insufficient lighting, fire hazards, inadequate fire protection, unsafe machinery, internal disturbance, or unsatisfactory operation, the captain of the port may prevent the mooring of any vessel to such wharf, dock, pier, or other waterfront structure until the unsatisfactory condition or conditions so found are corrected, and he may, for the same reasons, after any vessel has been moored, compel the shifting of such vessel
§ 25.3 Admission to the GAO building.
A person may be admitted to the GAO Building after presentation of personal identification to conduct lawful business with GAO, its employees, or other tenants of the GAO Building and for any other purposes authorized by the Comptroller General or his designee. During normal working hours, the GAO Building shall be open to
§ 15.1 Uniform relocation assistance and real property acquisition.
Regulations and procedures for complying with the Uniform Relocation Assistance Act of 1970 (Pub. L. 91–646, 84 Stat. 1894, 42 U.S.C. 4601) as amended by
§ 70.01-5 Penalty.
Any person violating the provisions of this section shall be deemed guilty of a misdemeanor and be subject to a fine not exceeding the sum of $500 for each offense, and each day during which such violation shall continue shall be considered a new offense.
[CGFR 52–15,
includes the next business day.
(b) If the period of time allowed is less than seven days, intermediate Saturdays, Sundays, and legal holidays observed by the Federal Government are excluded from the computation.
(c) If a document has been served or issued by placing it in the mail, an additional five days is added to the time permitted for any response.
(Authority:
31 U.S.C. 3803 (f))
(b) The transcript of testimony, exhibits and other evidence admitted at the hearing, and all papers and requests filed in the proceeding constitute the record for the decision by the ALJ and the Department head.
(c) The record may be inspected and copied (upon payment of a reasonable fee) by anyone, unless otherwise ordered by the ALJ pursuant to
§ 33.44 Right to administrative offset.
The amount of any penalty or assessment that has become final, or for which a judgment has been entered under § 33.42 or
.
Note:
Fore and aft moorings will be allowed in this area conforming to the City of Santa Barbara Harbor Ordinance No. 2106 for yachts and small craft of such size and alignment as permitted by the harbor master.
{"origins":[{"level":"part","identifier":"110","label_level":"Part 110","hierarchy":{"title":"33","chapter":"I","subchapter":"I","part":"110"},"current
§ 361.165 May a State establish additional indicators of performance?
States may identify additional indicators of performance for the six core programs. If a State does so, these indicators must be included in the Unified or Combined State Plan.
{"origins":[{"level":"part
available on the Department's web site.
(b) If the Secretary denies continued recognition to a previously recognized agency, or if the Secretary limits, suspends, or terminates the agency's recognition before the end of its recognition period, the Secretary publishes a notice of that action in the Federal Register. The Secretary also makes the reasons for the action available to the public, on request.
documented vessel, even if no other relationship exists between the State and the vessel or its owner.
(b) A vessel becomes covered by a certificate of title when an application for the certificate and the applicable fee are delivered to the office in accordance with this subpart or to the governmental agency that creates a certificate in another jurisdiction in accordance with the law of that jurisdiction.
§ 183.601 Applicability.
This subpart applies to all boats that have gasoline engines for electrical generation, mechanical power, or propulsion.
[USCG–1999–5832, 64 FR 34716, June 29, 1999]
§ 183.538 Metallic fuel line materials.
Each metallic fuel line connecting the fuel tank with the fuel inlet connection on the engine must:
(a) Be made of seamless annealed copper, nickel copper, or copper-nickel; and
(b) Except for corrugated flexible fuel line, have a minimum wall
§ 183.556 Plugs and fittings.
(a) A fuel system must not have a fitting for draining fuel.
(b) A plug used to service the fuel filter or strainer must have a tapered pipethread or be a screw type fitted with a locking device other than a split lock washer.
, or any other person acting as an agent for any person subject to this prohibition.
{"origins":[{"level":"part","identifier":"500","label_level":"Part 500","hierarchy":{"title":"29","subtitle":"B","chapter":"V","subchapter":"A","part":"500"},"current":false,"authority":["Pub. L. 97–470, 96 Stat. 2583 (\u003ca href=\"https://www.govinfo.gov/link/uscode/29/1801\" class=\"usc external\" target=\"_blank\" rel=\"noopener
§ 500.54 Change of address.
During the period for which the Certificate of Registration or Employee Certificate is in effect, each farm labor contractor or farm labor contractor employee shall provide to the Secretary, within thirty (30) days, a notice of each change of permanent place of residence in accordance with