Search returned 50558 results for "aoeah fc 26 Besuche die Website Buyfc26coins.com. Schnell wie der Wind..Hchw"
, Nov. 13, 2015; CBP Dec. 16-26, 81 FR 93017, Dec. 20, 2016]
to remain on the baggage. [T.D. 70-121, 35 FR 8215, May 26, 1970, as amended by T.D. 71-70, 36 FR 4491, Mar. 6, 1971; T.D. 84-212, 49 FR 39047, Oct. 3, 1984; T.D. 87-75, 52 FR 20068, May 29, 1987; T.D. 00-22, 65 FR 16518, Mar. 29, 2000; CBP Dec. 17-13, 82 FR 45405, Sept. 28, 2017]
this part. In such cases the expenses of the Customs officer shall be reimbursed to the Government as provided for in §134.55. [T.D. 72-262, 37 FR 20318, Sept. 29, 1972, as amended by T.D. 73-175, 38 FR 17447, July 2, 1973; T.D. 84-18, 49 FR 1678, Jan. 13, 1984; CBP Dec. 15-14, 80 FR 61288, Oct. 13, 2015; CBP Dec. 16-26, 81 FR 93018, Dec. 20, 2016]
. 9, 1979, as amended by T.D. 89-104, 54 FR 50498, Dec. 7, 1989; T.D. 93-37, 58 FR 30984, May 28, 1993; T.D. 95-77, 60 FR 50020, Sept. 27, 1995; CBP Dec. No. 16-26, 81 FR 93020, Dec. 20, 2016]
Collection of duty and taxes. Any duties and taxes found due shall be collected as in the case of arriving passengers. [T.D. 73-27, 38 FR 2449, Jan. 26, 1973, as amended by T.D. 78-99, 43 FR 13061, Mar. 29, 1978]
§151.73. [T.D. 73-175, 38 FR 17470, July 2, 1973, as amended by T.D. 75-121, 40 FR 23458, May 30, 1975; T.D. 93-52, 58 FR 37854, July 14, 1993; CBP Dec. No. 16-26, 81 FR 93021, Dec. 20, 2016]
[T.D. 73-175, 38 FR 17482, July 2, 1973, as amended by T.D. 90-1, 54 FR 52933, Dec. 26, 1989; CBP Dec. 11-02, 76 FR 2576, Jan. 14, 2011; CBP Dec. No. 16-25, 81 FR 89381, Dec. 12, 2016]
, its workers, and the communities where production facilities of such industry are located, and on other domestic industries. [60 FR 10, Jan. 3, 1995, as amended at 67 FR 8190, Feb. 22, 2002; 77 FR 3925, Jan. 26, 2012]
[T.D. ATF-235, 51 FR 34205, Sept. 26, 1986]
section 1, T23S/R5W (Scotts Valley Quadrangle); then (5) Proceed southwesterly along the 800-foot contour line, re-cross the R4W/R5W range line, and continue to the second intersection of the 800-foot contour line and the pipeline in section 1, T23/R5W (Scotts Valley Quadrangle); then (6) Proceed 5.75 miles southwesterly along the pipeline, cross Wilson Creek in section 24, T23S/R5W, return to the Yoncalla map in section 26, T23S/R5W
the west and Sheldon Road to the east at the northwest corner of section 28, T7N, R5E (Florin Quadrangle); then (4) Proceed east 2.4 miles on Sheldon Road to its intersection with State Route 99 at the northern boundary section 26, T7N, R5E (Florin Quadrangle); then (5) Proceed south-southeast 6 miles on State Route 99, crossing over the Elk Grove map, to the road's intersection with the Southern Pacific railway line at McConnell
convicted of any offense under Title 26, U.S.C., punishable as a felony or of any conspiracy to commit such offense. (b) If any of the information required by paragraphs (a)(4) through (a)(10) and any information which may be required under paragraph (a)(11) of this section is on file with any appropriate TTB officer, the applicant may incorporate this information by reference by stating that the information is made a part of the application.
(Approved by the Office of Management and Budget under control number 1512-0368) [T.D. ATF-420, 64 FR 71944, Dec. 22, 1999. Redesignated and amended by T.D. TTB-16, 69 FR 52424, 52425, Aug. 26, 2004]
holiday. For purposes of this section, “legal holiday” is defined by section 7503 of the Code and 26 CFR 301.7503(b). (d) Late filing. The taxpayer is subject to a penalty for failure to file a return or to pay tax within the prescribed time as imposed by section 6651 of the Code, if the return and remittance are not filed before the close of business on the prescribed last day of filing. For additions to the tax in the case of
geologic, hydrologic, topographic and climatic characteristics of the community's land. The buffer may be used for suitable open space purposes, such as for agricultural, forestry, outdoor recreation and wildlife habitat areas, and for other activities using temporary and portable structures only. [41 FR 46975, Oct. 26, 1976. Redesignated at 44 FR 31177, May 31, 1979, as amended at 48 FR 44552, Sept. 29, 1983; 49 FR 4751, Feb. 8, 1984]
West longitude in water depths entirely less than 400 meters deep. (b) The lease has not produced gas or oil from a well with a perforated interval the top of which is 18,000 feet TVD SS or deeper that commenced drilling either: (1) Before March 26, 2003, on a lease that is located partly or entirely in water less than 200 meters deep; or (2) Before May 18, 2007, on a lease that is located in water
(43 U.S.C. 1331-1356a). BOEM will protect proprietary information collected according to section 26 of OCSLA (43 U.S.C. 1352), and this section. (3) The Paperwork Reduction Act of 1995 (
In accordance with OCSLA section 18(a)(4) (43 U.S.C. 1344(a)(4)), BOEM must evaluate every bid to ensure that the federal government receives fair market value for every lease. Section 26(a)(1)(A) of OCSLA (43 U.S.C. 1352(a)(1)(A)) provides that, in
. (f) Underground disposal. Coal mine waste may be disposed of in underground mine workings, but only in accordance with a plan approved by the regulatory authority and MSHA under §784.25 of this chapter. [48 FR 44028, Sept. 26, 1983, as amended at 56 FR 65635, Dec. 17, 1991; 81 FR
removed within a 10-day period. (f) For an impounding structure constructed of or impounding coal mine waste, at least 90 percent of the water stored during the design precipitation event shall be removed within the 10-day period following the design precipitation event. [48 FR 44029, Sept. 26, 1983, as amended at 53 FR 43606, Oct. 27, 1988; 81 FR 93392, Dec. 20, 2016; 82 FR 54979, Nov. 17, 2017]
. (f) Underground disposal. Coal mine waste may be disposed of in underground mine workings, but only in accordance with a plan approved by the regulatory authority and MSHA under §784.25 of this chapter. [48 FR 44030, Sept. 26, 1983, as amended at 56 FR 65636, Dec. 17, 1991; 81 FR
be removed within a 10-day period. (f) For an impounding structure constructed of or impounding coal mine waste, at least 90 percent of the water stored during the design precipitation event shall be removed within the 10-day period following the design precipitation event. [48 FR 44031, Sept. 26, 1983, as amended at 53 FR 43608, Oct. 27, 1988; 81 FR 93418, Dec. 20, 2016; 82 FR 54999, Nov. 17, 2017]
January 10, 1989 Approval of emergency reclamation program. June 29 and July 26, 1989 November 30, 1989 KAR 47-16-1, -16-2, -16-4 through -8; policy and procedures for project ranking and selection; organization structure; public participation.
the assessment amount to be applied with the effective date. [58 FR 45438, Aug. 30, 1993, as amended at 73 FR 15897, Mar. 26, 2008]
comply with the requirements of cross-cutters, including initiating any required consultations with State or Federal agencies responsible for individual cross-cutters. A State must inform EPA when consultation or coordination with other Federal agencies is necessary to resolve issues regarding compliance with cross-cutter requirements. [65 FR 48299, Aug. 7, 2000, as amended at 73 FR 15922, Mar. 26, 2008]
[77 FR 17343, Mar. 26, 2012, as amended at 77 FR 28784, May 16, 2012; 81 FR 26709, May 4, 2016; 82 FR 50819, Nov. 2, 2017]
subpart BBBBB of part 97 of this chapter authorizing the Administrator to complete the allocation and recordation of CSAPR NOX Ozone Season Group 1 allowances to units in the State for each such control period shall continue to apply, unless provided otherwise by such approval of the State's SIP revision. [76 FR 48363, Aug. 8, 2011, as amended at 81 FR 74586 and 74594, Oct. 26, 2016]
plan. [45 FR 72143, Oct. 31, 1980, as amended at 45 FR 72147, Oct. 31, 1980; 49 FR 22815, June 1, 1984; 51 FR 10391, Mar. 26, 1986; 54 FR 615, Jan. 9, 1989; 54 FR 12621, Mar. 28, 1989; 55 FR 17752, Apr. 27, 1990; 71 FR 31100, June 1, 2006]
(a) of this section. (e) An owner or operator of an affected facility that combusts only gaseous or liquid fossil fuel (excluding residual oil) with potential SO2 emissions rates of 26 ng/J (0.060 lb/MMBtu) or less and that does not use post-combustion technology to reduce emissions of SO2 or PM is exempt from the PM standards specified in paragraph (a) of
Class I units that began construction, reconstruction, or modification after June 26, 1987, comply with the dioxins/furans and mercury limits by the later of two dates: 1. One year after the effective date of State plan approval. 2. One year after the issuance of a revised construction or operation permit, if a permit modification is required.