Search returned 323052 results for "free fc coins xbox one Visit Buyfc26coins.com for latest FC 26 coins news..yEY9"
Each building or part of a building that is constructed or altered by, on behalf of, or for the use of the agency shall be designed, constructed, or altered so as to be readily accessible to and usable by disabled persons. The definitions, requirements, and standards of the Architectural Barriers Act (42 U.S.C. 4151-4157), as established in 41 CFR 101-19.600 to 101-19.607, apply to buildings
If a recipient sells or otherwise transfers property financed in whole or in part with Federal financial assistance to a transferee that operates any education program or activity, and the Federal share of the fair market value of the property is not upon such sale or transfer properly accounted for to the Federal Government, both the transferor and the transferee shall be deemed to be recipients, subject to the provisions of
The Commission may, upon application of any interested party, grant an exemption from the requirements of this part. Exemptions will be granted only if they are authorized by law and will not constitute an undue risk to the common defense and security. Documentation related to the request, notification and processing of an exemption shall be maintained for three years beyond the period covered by the exemption. [45 FR
The NRC shall send notice of a final denial of a claim in writing to the claimant, his or her attorney or legal representative, by certified or registered mail. The notification of final denial may include a statement of the reasons for the denial. The NRC shall include a statement in the notification of final denial that, if the claimant is dissatisfied with NRC's action, he or she may file suit in an appropriate U.S. District Court not later than 6 months after the date of mailing of the
(a) A licensee shall maintain accountability at all times for all brachytherapy sources in storage or use. (b) As soon as possible after removing sources from a patient or a human research subject, a licensee shall return brachytherapy sources to a secure storage area. (c) A licensee shall maintain a record of the brachytherapy source accountability in accordance with
(a) If electrical power at a panoramic irradiator is lost for longer than 10 seconds, the sources must automatically return to the shielded position. (b) The lock on the door of the radiation room of a panoramic irradiator may not be deactivated by a power failure. (c) During a power failure, the area of any irradiator where sources are located may be entered only when using an operable and calibrated
(a) Each licensee shall afford to the Commission at all reasonable times opportunity to inspect category 1 or category 2 quantities of radioactive material and the premises and facilities wherein the nuclear material is used, produced, or stored. (b) Each licensee shall make available to the Commission for inspection, upon reasonable notice, records kept by the licensee pertaining to its receipt, possession, use, acquisition, import
A person subject to the regulations in this part may not receive title to, own, receive, possess, use, transfer, provide for long-term care, deliver or dispose of byproduct material or residual radioactive material as defined in this part or any source material after removal from its place of deposit in nature, unless authorized in a specific or general license issued by the Commission under the regulations in this part.
After receipt and consideration of comments requested pursuant to §§51.73 and 51.117, the NRC staff will prepare a final environmental impact statement in accordance with the requirements in §§51.70(b) and 51.71 for a draft environmental impact statement. The format provided in section 1(a) of
In any public hearing requested under 10 CFR 52.103(b), the Commission will not admit any contentions on environmental issues, the adequacy of the environmental impact statement for the combined license issued under subpart C of part 52, or the adequacy of any other environmental impact statement or environmental assessment referenced in the combined license application. The Commission will not make any environmental findings in connection with the finding under 10
this requirement shall be grounds for denial of a license.
(a) An application for amendment of a construction authorization shall be filed with the Commission fully describing any changes desired and following as far as applicable the format prescribed in §60.21. (b) In determining whether an amendment of a construction authorization will be approved, the Commission will be guided by the
(a) An application for amendment of a license must be filed in accordance with §61.20 and shall fully describe the changes desired. (b) In determining whether an amendment to a license will be approved, the Commission will apply the criteria set forth in
(a) The Commission may terminate a grant of emergency access when emergency access is no longer necessary to eliminate an immediate threat to public health and safety or the common defense and security. (b) The Commission may terminate a grant of emergency access if an applicant has provided inaccurate information in its application for emergency access or if the applicant has failed to comply with this part or any conditions set by
(a) An application for amendment of a construction authorization must be filed with the Commission that fully describes any desired changes and follows, as far as applicable, the content requirements prescribed in §63.21. (b) In determining whether an amendment of a construction authorization will be approved, the Commission will be
The licensee, certificate holder, and applicant for a CoC shall establish measures to assure that conditions adverse to quality, such as deficiencies, deviations, defective material and equipment, and nonconformances, are promptly identified and corrected. In the case of a significant condition adverse to quality, the measures must assure that the cause of the condition is determined and corrective action taken to preclude repetition. The identification of the significant condition adverse
The licensee, certificate holder, and applicant for a CoC shall carry out a comprehensive system of planned and periodic audits to verify compliance with all aspects of the quality assurance program and to determine the effectiveness of the program. The audits must be performed in accordance with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited. Audited results must be documented and reviewed by management
This subpart contains definitions, test procedures, and energy conservation requirements for small electric motors, pursuant to Part A-1 of Title III of the Energy Policy and Conservation Act, as amended, 42 U.S.C. 6311-6317. This subpart does not cover “electric motors,” which are addressed in subpart B of this part.
For the purpose of compliance with section 553 of the National Energy Conservation Policy Act: (a) ENERGY STAR qualified and FEMP designated products may be assumed to be life-cycle cost-effective. (b) In making a determination that a covered product is not life-cycle cost-effective, an agency should rely on the life-cycle cost analysis method in part 436, subpart A, of title 10 of the Code of Federal
Financial assistance awarded under this subpart may be expended for the design (excluding design costs funded under the technical assistance program), acquisition, and installation of energy conservation measures to reduce energy consumption or measures to allow the use of renewable resources in schools and hospitals or to shift energy usage to periods of low demand and cost. Such measures include, but are not necessarily limited to, those included in the definition of “energy conservation
(a) DOE shall establish a credit account for each fleet or covered person that obtains an alternative fueled vehicle credit. (b) DOE shall send to each fleet and covered person an annual credit account balance statement after the receipt of its credit activity report under §490.508. [79 FR
DOE may issue a proposed assessment of, and order to pay, a civil penalty in a written statement setting forth supporting findings of violation of the Act or a relevant regulation of this part. The proposed assessment and order shall be served on the person named therein by certified mail, return-receipt requested, and shall become final for DOE if not timely appealed pursuant to section 490.607
DOE may increase the qualifying volume of the biodiesel component of fuel for purposes of allocation of credits under this subpart only after it: (a) Collects data establishing that the average annual alternative fuel use in light duty vehicles by fleets and covered persons exceeds 450 gallons or gallon equivalents; and (b) Conducts a rulemaking to amend the provisions of this subpart to change the
This part sets forth the policies and procedures applicable to the award and administration of grants and cooperative agreements by DOE (through the Office of Environment, Health Safety and Security or any office to which its functions are subsequently redelegated) for health related research, education/training, conferences, communication, and related activities. [60 FR 5841, Jan. 31, 1995, as amended at 71 FR 68729
A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S.C. 6303, reflects a relationship between the Federal Government and a State, a local government, or other non-government entity when the principal purpose of the instrument is to acquire property or services for the direct benefit or use of the Federal Government. See the more detailed definition of
The Secretary of Energy (or the Secretary's designee) may approve the extension of any deadline established by this part, and the OHA Director may approve the extension of any deadline under §§708.22 through 708.34 of this subpart (relating to the investigation, hearing, and OHA appeal process). Failure by the DOE to comply with timing requirements does not create a substantive right for any
An IRB shall have authority to suspend or terminate approval of research that is not being conducted in accordance with the IRB's requirements or that has been associated with unexpected serious harm to subjects. Any suspension or termination of approval shall include a statement of the reasons for the IRB's action and shall be reported promptly to the investigator, appropriate institutional officials, and the department or agency head.
patent and state the basis for the proposed declaration.
Within fifteen days after the filing of the transcript of the hearing, or within such longer time as may be fixed by the Presiding Officer, any party may file for the consideration of the Presiding Officer, proposed findings of fact, conclusions of law, and a proposed order, together with briefs in support thereof. Reply briefs may be filed within ten days of the filing of briefs. All filings shall be in writing, shall be served upon all parties, and shall contain adequate references to the
Unless otherwise specified, the quantities used in the records required by this part shall be clearly indicated in special units of curie, rad, roentgen, or rem, including multiples and subdivisions of these units, or other conventional units, such as, dpm, dpm/100 cm2 or mass units. The SI units, becquerel (Bq), gray (Gy), and sievert (Sv), may be provided parenthetically for reference with scientific standards.