(a) The minimum mesh size for the cod end of a rock shrimp trawl net in the South Atlantic EEZ off Georgia and Florida is 17⁄8 inches (4.8 cm), stretched mesh. This minimum mesh size is required in at least the last 40 meshes forward of the cod end drawstring (tie-off rings), and smaller-mesh bag liners are not allowed. A vessel that has a trawl net on board
Harvest specifications include OFLs, ABCs, and the designation of OYs and ACLs. Management measures necessary to keep catch within the ACL include ACTs, harvest guidelines (HGs), or quotas for species that need individual management, and the allocation of fishery HGs between the trawl and nontrawl segments of the fishery, and the allocation of commercial HGs between the open access and limited entry segments of the fishery. These specifications include fish caught
For each conveyor belt flight exceeding 2,000 feet in length, where the average air velocity along the belt haulage entry exceeds 100 feet per minute, an additional cache of the materials specified in §75.1103-9(a)(1), (2), and (3) shall be provided. The additional cache may be stored at the locations specified in
In addition to the requirements set forth in §250.107, when conducting exploratory drilling operations on the Arctic OCS, you must protect health, safety, property, and the environment by using the following: (a) Equipment and materials that are rated or de-rated for service under conditions that can be reasonably expected during your
(a) If we believe that you have not followed any requirement of a statute, regulation, order, or lease term for any Federal oil or gas lease, we may send you a Notice of Noncompliance informing you what the violation is and what you need to do to correct it to avoid civil penalties under 30 U.S.C. 1719(a) and (b). (b) We will serve the
(a) Governor. The Regional Supervisor will accept those recommendations from the Governor that provide a reasonable balance between the National interest and the well-being of the citizens of each affected State. The Regional Supervisor will explain in writing to the Governor the reasons for rejecting any of his or her recommendations. (b) Local governments and the
(b) Results of review. The Regional Supervisor may require you to revise your approved EP, DPP, or DOCD based on this review. In such cases, the Regional Supervisor will inform you of the reasons for the decision.
(a) If we believe that you have not followed any requirement of a statute, regulation, order, or lease term for any Federal oil or gas lease, we may send you a Notice of Noncompliance informing you what the violation is and what you need to do to correct it to avoid civil penalties under 30 U.S.C. 1719(a) and (b). (b) We will serve the
(a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan shall comply with the requirements of §582.28(e) of this part. (b) The Director may order or the lessee may request the Director's approval of a modification of
any renewable energy resource. (c) You do not need an ROW grant or RUE grant for a project easement authorized under §585.200(b) to serve your lease.
the applicant. BOEM may require additional surveys to define boundaries and avoidance distances. (c) If required, BOEM will specify the survey methods and instrumentations for conducting the biological survey and will specify the contents of the biological report.
(a) Except as otherwise provided, computation of time under this chapter is based on calendar days. (b) In computing any period of prescribed time, the day on which the designated period of time begins is not included. The last day of the period is included unless it is a Saturday, Sunday, or legal holiday on which the regulatory authority is not open for business, in which event the period runs until the end of the next day which is
Employees have the right to appeal an order for remedial action under §705.19, and shall have 30 days to exercise this right before disciplinary action is initiated. (a) Employees other than the Head of the State Regulatory Authority, may file their appeal, in writing, through established procedures within their particular State.
The objectives of this part are: (a) To ensure that affected Federal agencies adopt a standard program for implementing the provisions in section 201(f) of the Act. (b) To establish methods which will ensure, as required by section 201(f) of the Act, that each Federal employee who performs any function or duty under the Act does not have a direct or indirect financial interest in an underground or
(a) This part provides general introductory and applicability material for the initial regulatory program required by section 502 and other sections of the Act which require early implementation. The initial regulatory program is effective until permanent programs are approved in accordance with sections 503, 504, or 523 of the Act. (b) The initial regulatory program which this part introduces includes—
(a) Neither a notice of violation nor a cessation order issued under this part may be vacated because of inability to comply. (b) A permittee may not be deemed to have shown good cause for not suspending or revoking a permit by showing inability to comply. (c) Unless caused by lack of diligence, inability to comply may be considered in mitigation of the amount of a civil penalty under part 723 of this
(a) A surety bond shall be executed by the operator and a corporate surety licensed to do business in the State where the operation is located. (b) Surety bonds shall be noncancellable during their terms, except that surety bond coverage for lands not disturbed may be cancelled with the prior consent of the regulatory authority. The regulatory authority shall advise the surety, within 30 days after receipt of a notice to cancel bond
Each exploration hole, other drill or boreholes, wells and other exposed underground openings which have been identified in the approved permit application for use to return coal processing waste or water to underground workings, or to be used to monitor ground water conditions, shall be temporarily sealed before use and protected during use by barricades, or fences, or other protective devices approved by the regulatory authority. These devices shall be
(a) All exposed surface areas shall be protected and stabilized to effectively control erosion and air pollution attendant to erosion. (b) Rills and gullies, which form in areas that have been regraded and topsoiled and which either (1) disrupt the approved postmining land use or the reestablishment of the vegetative cover, or (2) cause or contribute to a violation of water quality standards for receiving streams shall be filled
(a) All exposed surface areas shall be protected and stabilized to effectively control erosion and air pollution attendant to erosion. (b) Rills and gullies which form in areas that have been regraded and topsoiled and which either (1) disrupt the approved postmining land use or the reestablishment of the vegetative cover, or (2) cause or contribute to a violation of water quality standards for receiving streams; shall be filled
Reclamation efforts, including but not limited to backfilling, grading, topsoil replacement, and revegetation, on all areas affected by surface impacts incident to an underground coal mine shall occur as contemporaneously as practicable with mining operations, except when such mining operations are conducted in accordance with a variance for concurrent surface and underground mining activities issued under
provide the information collection requirements and performance standards for alluvial valley floors. This information will be used to enable the regulatory authority to assess the impact of the proposed operation during the permanent regulatory program. The obligation to respond is mandatory.
As used in this part— Award means to approve our grant agreement authorizing you to draw down and expend program funds. Distribute means to annually assign funds to a specific State or Indian tribe. After distribution, funds are available for award in a grant to that specific State or Indian tribe.
As used in this Part— Award means to approve our grant agreement authorizing you to draw down and expend program funds. Distribute means to annually assign funds to a specific State or Indian tribe. After distribution, funds are available for award in a grant to that specific State or Indian tribe.
(a) Part 816 of this chapter, Permanent Program Performance Standards—Surface Mining Activities, shall apply to any person who conducts surface coal mining and reclamation operations. (b) No person shall conduct surface coal mining operations except in compliance with the Georgia Safe Dams Act and Rules for Safety of the Natural Resources, Environmental Protection Division; the Solid Waste
The approval of the Virginia State program is subject to the State revising its program to correct the deficiencies listed in this section. The program revisions may be made, as appropriate, to the statute, the regulations, the program narrative, or the Attorney General's opinion. This section indicates, for the general guidance of the State, the component of the program to which the Secretary recommends the change be made.
(a) Part 817 of this chapter, Permanent Program Performance Standards—Underground Mining Activities, shall apply to any person who conducts underground coal mining operations. (b) All operators shall have a plan of reclamation approved by the Washington Department of Fisheries for operation in affected streams, RCW 75, and shall comply with the Hydraulic Project Approval Law, RCW 75.20.100, the
If you determine royalties or direct use fees for your geothermal resource under this subpart, you must retain all data relevant to the determination of the royalty value or the fee you paid. Recordkeeping requirements are found at part 1212 of this chapter. (a) You must be able to show: (1) How you calculated the royalty value or fee you reported, including all allowable deductions; and
pertinent matters to another Federal, State, or local government agency for any action that that agency determines to be appropriate. [71 FR 6168, Feb. 6, 2006, as amended at 78 FR 10544, Feb. 14, 2013]
The amount of any penalty or assessment which has become final, or for which a judgment has been entered under §§27.42 or 27.43, or any amount agreed upon in a compromise or settlement under §27.46, may be collected by administrative offset under