Search returned 320226 results for "free fc coins xbox one Visit Buyfc26coins.com for latest FC 26 coins news..yEY9"
All natural gas companies not classified as Class C or Class D prior to January 1, 1984 shall secure for each year, the services of an independent certified public accountant, or independent licensed public accountant (licensed on or before December 31, 1970), certified or licensed by a regulatory authority of a State or other political subdivision of the United States, to test compliance in all material respects of those schedules that are indicated in the General
(a) By the Commission. Orders of authorization under section 305(b) of the Act are subject to revocation by the Commission after due notice to applicant and opportunity for hearing. In any such proceeding the burden of proof shall be upon the applicant to show that neither public nor private interests will be adversely affected by the holding of such positions.
(b)
statement showing the reasons for the cancellation or termination, a list of the affected customers and the contract demand provided to the customers under the service to be canceled. A copy of the notice must be duly posted tariff filing in the electronic format required by §154.4.
[Order 582, 60 FR 52996, Oct. 11, 1995, as amended by Order 714, 73 FR 57535
(a) State regulatory authority and nonregulated electric utility waivers. Any State regulatory authority (with respect to any electric utility over which it has ratemaking authority) or nonregulated electric utility may, after public notice in the area served by the electric utility, apply for a waiver from the application of any of the requirements of subpart C (other than
accounts and other statistical work for sales purposes not a part of the regular customer accounting and billing routine.
(3) Miscellaneous labor.
(c) This account must include the following materials and expenses items:
(1) Communication service.
(2) Printing, postage, and office supplies and expenses applicable to sales activities, except those chargeable to account
consideration of the environmental aspects of proposed actions is built into the decision-making process in order that adverse environmental effects may be avoided or minimized, consistent with the requirements of NEPA.
(c) Environmental reviews under NEPA will assist decision makers in making better, more knowledgeable decisions that consider those reasonable alternatives to the proposed action that fulfill the purpose and need for the action, concisely present the
electrical codes (satisfactory evidence of compliance to be provided to TVA upon request).
(b) Electrical service shall be installed with an electrical disconnect that is located above the 500-year floodplain or the flood risk profile, whichever is higher, and is accessible during flood events.
(c) TVA's issuance of a permit does not mean that TVA has determined the facilities are safe for any purpose or that TVA has any duty to make such
arise therefrom unless it be made with a corporation for its general benefit; nor shall Contractor offer or give, directly or indirectly, to any officer, employee, special Government employee, or agent of TVA, any gift, gratuity, favor, entertainment, loan, or any other thing of monetary value, except as provided in 5 CFR part 2635. Breach of this clause shall constitute a material breach of this contract, and TVA shall have the right to exercise all remedies provided in this contract or at law.
(3) State the date suggested for issuance of a decision by the Contracting Officer.
(c) TVA may reply to a motion under this section within 5 days after its receipt.
(d) The Chairman shall issue a written decision on the request. If granted, the decision shall specify the date by which the Contracting Officer's decision is to be rendered, and a copy shall be served on the Contracting Officer.
(c) The Coast Guard will issue a “Certificate attesting recognition” to an applicant after ensuring the validity and authenticity of the credential (certificate of competency) issued by his or her country of origin.
(d) No application from a non-US citizen for a “Certificate attesting recognition” issued pursuant to this subpart will be accepted unless the applicant's employer satisfies the requirements of
The President may make an international agreement with other governments interested in the navigation of the North Atlantic Ocean, providing for the reporting, marking, and removal of dangerous wrecks, derelicts, and other menaces to navigation outside the coast waters of the countries bordering the North Atlantic Ocean.
, substituting provisions empowering the Secretaries of State and Commerce to accept or reject recommendations made by the Commission, which were previously contained in section 1157 of this title, for provisions authorizing Federal agency consultation with and technical assistance to the Secretary of Commerce or the Commission. See
(b) Each space that has a coal conveyer on a vessel that carries coal is a Class II, Division 2, (Zone 11 or Y) space.
(c) A space that has a coal conveyer on a vessel that carries coal must have electrical equipment approved for Class II, Division 2, (Zone 11 or Y) hazardous locations, except watertight general emergency alarm signals.
[CGD 94-108, 61 FR 28285, June 4, 1996]
different production tests if the tests required by this subpart are not appropriate for the alternative ladder configuration.
(a) The following military specifications are incorporated by reference into this subpart:
(1) MIL-R-23139 B, 16 August 1965—Rocket Motors, Surface Launched, Development and Qualification Requirements for.
(2) MIL-R-45505 A, 2 April 1971—Line Throwing Apparatuses, Rocket and Projectile Units.
(b) The military specifications may be obtained from Military Specifications
the inert gas must be below the temperature of any surface in those spaces or −45 °C (−49 °F), whichever is warmer.
(c) For the temperatures and pressures at which the gas is stored and used, storage vessels and inert gas piping must meet §§154.450 and 154.500 respectively.
[CGD 74-289, 44 FR 26009, May 3, 1979, as