- (a)The cost-plus-a-percentage-of-cost system of contracting may not be used.
- (b)The fee for performing a cost-plus-a-fixed-fee contract for experimental, developmental, or research work may not be more than 15 percent of the estimated cost of the contract, not including the fee. The fee for performing a cost-plus-a-fixed-fee contract for architectural or engineering services for a public work or utility plus the cost of those services to the contractor may not be more than 6 percent of the estimated cost of that work or project, not including fees. The fee for performing any other cost-plus-a-fixed-fee contract may not be more than 10 percent of the estimated cost of the contract, not including the fee. Determinations under this subsection of the estimated costs of a contract or project shall be made by the head of the agency at the time the contract is made.
- (c)
- (1)Except as provided in paragraph (2), each cost contract and each cost-plus-a-fixed-fee contract shall provide for notice to the agency by the contractor before the making, under the prime contract, of—
- (2)Paragraph (1) shall not apply to a prime contract with a contractor that maintains a purchasing system approved by the contracting officer for the contract.
- (d)
- (1)Except as provided by paragraph (2), a covered contract shall limit the number of low-rate production lots for any production quantities procured using fixed-priced options under such covered contract to not more than one.
- (2)
- (A)The service acquisition executive of the military department concerned or, in the case of program that is a joint program, the Secretary of Defense may waive the limit required under paragraph (1) with respect to the number of low-rate production lots for a production quantity under a covered contract if such service acquisition executive or the Secretary of Defense, as applicable, determines that such waiver is in the best interest of the Department of Defense.
- (B)Neither a service acquisition executive nor the Secretary of Defense may delegate the authority under subparagraph (A) to waive the limit required under paragraph (1) below the level of a service acquisition executive.
- (3)In this subsection: