16 U.S.C. § 539l–3 — Loop trail study; authorization
Verified against govinfo.gov as of June 20, 2026View official text on govinfo.gov ↗
- (a)StudyNot later than three years after funds are first made available for this purpose, the Secretary, in consultation with interested parties, shall complete a study of the suitability and feasibility of establishing, consistent with the purpose set forth in section 539l(a)(2) of this title, a loop trail for mechanized and other nonmotorized recreation connecting the trail designated as “Rogers Pass” and the trail designated as “Rollins Pass Road”.
- (b)EstablishmentIf the results of the study required by subsection (a) indicate that establishment of such a loop trail would be suitable and feasible, consistent with the purpose set forth in section 539l(a)(2) of this title, the Secretary shall establish the loop trail in a manner consistent with that purpose.