14 CFR §25.1363
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)When laboratory tests of the electrical system are conducted—
- (1)The tests must be performed on a mock-up using the same generating equipment used in the airplane;
- (2)The equipment must simulate the electrical characteristics of the distribution wiring and connected loads to the extent necessary for valid test results; and
- (3)Laboratory generator drives must simulate the actual prime movers on the airplane with respect to their reaction to generator loading, including loading due to faults.
- (b)For each flight condition that cannot be simulated adequately in the laboratory or by ground tests on the airplane, flight tests must be made.