18 CFR §1304.301
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
Upon application to and approval by TVA, utility lines (electric, water-intake lines, etc.) may be placed within the flowage easement area as follows:
- (a)Power lines, poles, electrical panels, and wiring shall be installed:
- (b)Electrical service shall be installed with an electrical disconnect that is located above the 500-year floodplain or the flood risk profile, whichever is higher, and is accessible during flood events.
- (c)TVA's issuance of a permit does not mean that TVA has determined the facilities are safe for any purpose or that TVA has any duty to make such a determination.