All pump-out facilities constructed after September 8, 2003 shall meet the following minimum design and operating requirements:
- (a)Spill-proof connection with shipboard holding tanks;
- (b)Suction controls or vacuum breaker capable of limiting suction to such levels as will avoid collapse of rigid holding tanks;
- (c)Available fresh water facilities for tank flushing;
- (d)Check valve and positive cut-off or other device to preclude spillage when breaking connection with vessel being severed;
- (e)Adequate interim storage where storage is necessary before transfer to approved treatment facilities;
- (f)No overflow outlet capable of discharging effluent into the reservoir;
- (g)Alarm system adequate to notify the operator when the holding tank is full;
- (h)Convenient access to holding tanks and piping system for purposes of inspection;
- (i)Spill-proof features adequate for transfer of sewage from all movable floating pump-out facilities to shore-based treatment plants or intermediate transfer facilities;
- (j)A reliable disposal method consisting of:
- (k)A written statement to TVA certifying that the system shall be operated and maintained in such a way as to prevent any discharge or seepage of wastewater or sewage into the reservoir.