18 CFR §141.51
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Who must file.
- (1)Any electric utility, as defined by section 3(4) of the Public Utility Regulatory Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities, which by way of contractual arrangements operates as a single balancing authority area, must complete and file the applicable schedules in FERC Form No. 714 with the Federal Energy Regulatory Commission.
- (2)Any electric utility, or group of electric utilities that constitutes a planning area and that has a peak load greater than 200 megawatts (MW) based on net energy for load for the reporting year, must complete applicable schedules in FERC Form No. 714.
- (b)When to file. FERC Form No. 714 must be filed on or before each June 1 for the preceding calendar year.
- (c)What to file. FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report, must be filed with the Federal Energy Regulatory Commission as prescribed in § 385.2011 of this chapter and as indicated in the General Instructions set out in this form.