- (a)The owner or operator converting an existing well to an injection well shall check the condition of the casing with one of the following logging tools;
- (b)The owner or operator of a new injection well cased with plastic (PVC, ABS, or others) casings shall:
- (c)The owner or operator of a newly drilled well shall install centralizers as directed by the Regional Administrator.
- (d)The owner or operator shall as required by the Regional Administrator:
- (1)Protect USDWs by:
- (2)Isolate any injection zones by placing sufficient cement to fill the calculated space between the casing and the well bore to a point 250 feet above the injection zone; and
- (3)Use cement:
- (4)The Regional Administrator may approve alternate casing and cementing practices provided that the owner or operator demonstrates that such practices will adequately protect USDWs.
- (e)Area of review. Notwithstanding the alternatives presented in § 146.6 of this chapter, the area of review shall be a fixed radius as described in § 146.6(b) of this chapter.
- (f)The applicant must give separate notice of intent to apply for a permit to each owner of record of the land within one-quarter mile of the site. The addresses of those to whom notice is given and the description of how notice was given shall be submitted with the permit application. The notice shall include:
- (1)The name and address of applicant;
- (2)A brief description of the planned injection activities, including well location, name and depth of the injection zone, maximum injection pressure and volume, and fluid to be injected;
- (3)The EPA contact person; and
- (4)A statement that opportunity to comment will be announced after EPA prepares a draft permit.