StacksVerified U.S. regulatory reference

40 CFR §147.3013

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
  1. (a)In addition to the information listed in § 146.14(a) of this chapter, the Director shall consider the following prior to issuing any Class I permit:
    1. (1)Expected pressure changes, native fluid displacement, and direction of movement of the injected fluid; and
    2. (2)Methods to be used for sampling, and for measurement and calculation of flow.
  2. (b)In addition to the information listed in § 146.14(b) of this chapter, the Director shall consider any information required under § 146.14(a) of this chapter (as supplemented by this subpart) that has been gathered during construction.