40 CFR §240.202-2
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Whenever possible, thermal processing facilities should be located in areas zoned for industrial use and having adequate utilities to serve the facility.
- (b)The site should be accessible by permanent roads leading from the public road system.
- (c)Environmental factors, climatological conditions, and socioeconomic factors should be given full consideration as selection criteria.