StacksVerified U.S. regulatory reference

40 CFR §258.26

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
  1. (a)Owners or operators of all MSWLF units must design, construct, and maintain:
    1. (1)A run-on control system to prevent flow onto the active portion of the landfill during the peak discharge from a 25-year storm;
    2. (2)A run-off control system from the active portion of the landfill to collect and control at least the water volume resulting from a 24-hour, 25-year storm.
  2. (b)Run-off from the active portion of the landfill unit must be handled in accordance with § 258.27(a) of this part.