40 CFR §267.54
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
You must review, and immediately amend the contingency plan, if necessary, whenever:
- (a)The facility permit is revised.
- (b)The plan fails in an emergency.
- (c)You change the facility (in its design, construction, operation, maintenance, or other circumstances) in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency.
- (d)You change the list of emergency coordinators.
- (e)You change the list of emergency equipment.