40 CFR §35.2040
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
Applicants for Step 2 + 3 or Step 3 assistance shall submit applications to the State. In addition to the information required in 2 CFR parts 200 and 1500, applicants shall provide the following information:
- (a)Step 2 + 3: Combined design and building of a treatment works and building related services and supplies. An application for Step 2 + 3 grant assistance shall include:
- (1)A facilities plan prepared in accordance with this subpart;
- (2)Certification from the State that there has been adequate public participation based on State and local statutes;
- (3)Notification of any advance received under § 35.2025(b);
- (4)Evidence of compliance with all application limitations on award (§§ 35.2100 through 35.2127); and
- (5)The project schedule.
- (b)Step 3: Building of a treatment works and related services and supplies An application for Step 3 grant assistance shall include:
- (1)A facilities plan prepared in accordance with this subpart;
- (2)Certification from the State that there has been adequate public participation based on State and local statutes;
- (3)Notification of any advance received under § 35.2025(b);
- (4)Evidence of compliance with all applicable limitations on award (§§ 35.2100 through 35.2127);
- (5)Final design drawings and specifications;
- (6)The project schedule; and
- (7)In the case of an application for Step 3 assistance that is solely for the acquisition of eligible real property, a plat which shows the legal description of the property to be acquired, a preliminary layout of the distribution and drainage systems, and an explanation of the intended method of acquiring the real property (see 40 CFR part 4).
- (c)Training facility project. An application for a grant for construction and support of a training facility, facilities or training programs under section 109(b) of the Act shall include:
- (d)Advances of allowance. State applications for advances of allowance to small communities shall be on government wide Application for Federal Assistance (SF-424). The application shall include:
- (e)Field Testing of Innovative and Alternative Technology. An application for field testing of I/A projects shall include a field testing plan containing:
- (1)Identification; including size, of all principal components to be tested;
- (2)Location of testing facilities in relationship to full scale design;
- (3)Identification of critical design parameters and performance variables that are to be verified as the basis for I/A determinations:
- (4)Schedule for construction of field testing facilities and duration of proposed testing;
- (5)Capital and O&M cost estimate of field testing facilities with documentation of cost effectiveness of field testing approach; and
- (6)Design drawing, process flow diagram, equipment specification and related engineering data and information sufficient to describe the overall design and proposed performance of the field testing facility.
- (f)Marine CSO Fund Project. An application for marine CSO grant assistance under § 35.2024(b) shall include:
- (g)Design/build project grant (Step 7). An application for a design/build project grant shall include: