StacksVerified U.S. regulatory reference

40 CFR §40.115-1

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
May include the preliminary planning to determine the economic and engineering feasibility of a facility, the engineering, architectural, legal, fiscal, and economic investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other action necessary to the construction of a facility, the erection, acquisition, alteration, remodeling, improvement, or extension of a facility, and the inspection and supervision of the construction of a facility.