40 CFR §40.140-1
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The relevancy of the proposed project to the objectives of the EPA research and demonstration program;
- (b)The availability of funds within EPA;
- (c)The technical feasibility of the project;
- (d)The seriousness, extent, and urgency of the environmental problems toward which the project is directed;
- (e)The anticipated public benefits to be derived from the project in relation to the costs of the project;
- (f)The competency of the applicant's staff and the adequacy of the applicant's facilities and available resources;
- (g)The degree to which the project can be expected to produce results that will have general application to pollution control problems nationwide;
- (h)Whether the project is consistent with existing plans or ongoing planning for the project area at the State, regional, and local levels;
- (i)The existence and extent of local public support for the project;
- (j)Whether the proposed project is environmentally sound;
- (k)Proposed cost sharing.