CFR › Title 40 › Part 60 › §60.219540 CFR §60.2195Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗Copy linkYou must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup:(a)The type(s) of waste to be burned;(b)The maximum design waste burning capacity;(c)The anticipated maximum charge rate;(d)If applicable, the petition for site-specific operating limits under § 60.2115; and(e)The anticipated date of initial startup.